NRG Instructions
SRA System | All-Weather PVH Kit
SRA_All-Weather_PVH_Kit_Instructions
Rev. 5.0
support@nrgsystems.com | Page 12
18 April 2018
2.2.6 Attach angle adjustment rails to tower and PV assembly.
The angle adjustment tower mount comes pre-assembled (Figure 2-12). First, remove the slide nuts and
add Loctite, then loosely reattach.
Figure 2-12: Out-of-box assembly of lower tower/angle adjuster mount.
To mount around the tower, first remove the components from one side of the threaded rods (Figure 2-
13). Slide around the tower approximately 44” below the U-bolt and reassemble (Figure 2-14). Ensure
that the threaded rod is evenly distributed on each side of the mount (1.5 – 1.75” beyond the innermost
rectangular bracket).
Figure 2-13: Disassembly of one side of lower tower mount.