SymphoniePRO User Manual
Rev. 8
support@nrgsystems.com | Page 79
11 January 2018
4.5.3 Install in Shelter Box
To install the assembled SymphoniePRO logger and iPack to the
shelter box, insert the shelter box’s mounting screws through the
holes in the hanging bracket and slide down to secure. Tighten the
screws before leaving the installation site.
4.5.4 Connecting Wiring Panel to Logger
For the SymphoniePRO-26 wiring panel, connect the 62 pin cable
assembly connector to the logger. It should be securely screwed
down using the thumb screws. Protect the pins by aligning the connector well before inserting, and avoid
plugging in the connector at an angle. Once it is secured to the logger, plug it into the wiring panel.
(26 Channel Wiring Panel) (16 Channel Wiring Panel)
For the SymphoniePRO-16 wiring panel, no cable assembly is required; directly connect the wiring panel to the
DB62 connector on the logger.
Summary of Contents for SymphoniePRO
Page 1: ......
Page 74: ...SymphoniePRO User Manual Rev 8 support nrgsystems com Page 74 11 January 2018 ...
Page 76: ...SymphoniePRO User Manual Rev 8 support nrgsystems com Page 76 11 January 2018 ...
Page 77: ...SymphoniePRO User Manual Rev 8 support nrgsystems com Page 77 11 January 2018 ...
Page 78: ...SymphoniePRO User Manual Rev 8 support nrgsystems com Page 78 11 January 2018 ...
Page 134: ...SymphoniePRO User Manual Rev 8 support nrgsystems com Page 134 11 January 2018 ...
Page 137: ...SymphoniePRO User Manual Rev 8 support nrgsystems com Page 137 11 January 2018 ...
Page 139: ...SymphoniePRO User Manual Rev 8 support nrgsystems com Page 139 11 January 2018 ...
Page 142: ...SymphoniePRO User Manual Rev 8 support nrgsystems com Page 142 11 January 2018 ...