NSGV SERIES “CYCLONE” DUST COLLECTOR
I, O & M MANUAL
ERECTION PROCEDURES
With the Cyclone in place, and after the After Filter upper modules have been assembled on the floor, assemble the Noise Attenuator with
respective transitions. This can be done on the floor and hoisted into position or you may assemble the transitions in steps off of the blower,
temporarily supporting each piece that is added. After completing this assembly procedure, hoist and temporarily support the After Filter module
assembly previously assembled. The After Filter assembly may now be bolted to the Noise Attenuator assembly. The assembly should look as
shown below.
NOTE: CAULK ALL FLANGES BEFORE BOLTING TOGETHER IN EACH STEP.
After Filter
Module Plenum
Transition
Large
Noise
Attenuator
and Blower
Cyclone Body
AIRFLOW
4
National System of Garage Ventilation
714 N. Church St. / P.O. Box 1186
Decatur, IL 62525
(217)423-7314 / (800)728-8368 / (fax)(217)422-5387
NSGV.com
JMDILLIGAF@aol.com