— 10-1 —
10. Positioning
10.1. Preparation
10.1.1. Wiring Check
!
Caution : Before operation, check the followings.
Table 10-1: Check list
Check item
Confirmation
1
Connection of Main power
and Input/Output cables
·
All wiring is properly arranged and completed.
·
Terminal block screws are securely fastened.
·
All connectors are connected and locked properly.
2
Cable Set
·
Cable Set (Motor and Resolver cables) is connected and locked
properly.
3
Handy Terminal
·
Handy Terminal (FHT11) is connected and locked to CN1
connector.
10.1.2. Procedure
Figure
10-1
·
Check power voltage (Main and Control power).
·
After the power is turned on, check the LED (green)
and the 7 segments LED on the front panel of the
Driver Unit are indicating in normal state.
·
Confirm the Handy Terminal display is showing
completion of the Driver Unit initialization.
1 Turn Power ON
·
Refer to “8. Trial Running and Adjustment.”
2 Adjustment
Home Return
Programmable Operation
Pulse Train Command Operation
RS-232C Communication
Jogging
(Refer to “Chapter 10.2”)
(Refer to “Chapter 10.3”)
(Refer to “Chapter 10.4”)
(Refer to “Chapter 10.5”)
(Refer to “Chapter 10.6”)
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com