1.
Standard Issue Items
The HRV comes equipped with:
Filters
Heat/Energy Recovery Core
Drain Kit
Anti-Vibration straps (NU0103, NU0305)
Anti-vibration Springs, chain & hanging brackets
(NU0406)
2.
Other Basic Needs
Control Package
Galvanized Duct
Flexible Duct Connector
Outside Hoods (2)
Duct Fittings
Duct Sealer or Tape
Screws
Diffusers
Duct Hanger
Balancing dampers
Air flow measuring device for balancing
3.3
Ductwork
Ductwork
Duct runs should be straight with minimum bends
and elbows. Joints should be tight fitting and
sealed with high velocity, fiber reinforced duct
sealant or good quality duct tape.
RECOMMENDATION: An engineer or other
qualified person should design the duct system
Ducting must be supported according to the
designers’ specified hanger system and intervals.
Ducting from the Weather Hoods
Between the weather hoods and the H/ERV it is recommended to use rigid rectangular ducting equal to or
larger than the collar size of the machine. These ducts should be wrapped with an insulating duct wrap.
The minimum RSI value of insulation should equal that of the local building codes.
HRAI-recommended hood location for residential applications.
Summary of Contents for NU0103
Page 25: ...Rev 2 3 July 17 2017 25...
Page 26: ...Rev 2 3 July 17 2017 26...
Page 27: ...Rev 2 3 July 17 2017 27...
Page 28: ...Rev 2 3 July 17 2017 28...
Page 29: ...Rev 2 3 July 17 2017 29...
Page 30: ...Rev 2 3 July 17 2017 30...
Page 31: ...Rev 2 3 July 17 2017 31...
Page 32: ...Rev 2 3 July 17 2017 32...
Page 33: ...Rev 2 3 July 17 2017 33...
Page 34: ...Rev 2 3 July 17 2017 34...
Page 35: ...Rev 2 3 July 17 2017 35...
Page 36: ...Rev 2 3 July 17 2017 36...
Page 37: ...Rev 2 3 July 17 2017 37...
Page 38: ...Rev 2 3 July 17 2017 38...