NOL 18-100 HL
Page 20
C
OMMISSIONING
S
HEET
The details below are to be completed by the Commissioning Engineer
Oil Viscosity:
Boiler Room Ventilation (BS 6644)
Flue Check (Visual) (BS 5440)
Oil Leaks (Visual)
COMBUSTION DETAILS
CO
2
%
Smoke Number
Ambient Temp.
°C
Gross Stack Temperature
°C
Chamber Pressure
mbar
Draught Smoke Hood
Fan Static
mbar/mm
Oil Temperature
°C
Oil Pressure Atomising bar
bar
Return Pressure
bar
Oil Throughput
cal/metre
Boiler Temperature / Pressure
Boiler Starting Resistance
mbar/mm
Air Control Setting %
%
P E Signal
SATISFACTORY / UNSATISFACTORY
DATE:
CHANGE TO SPECIFICATION: ……………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………
NAME: …………………………………………………………………………………..
SIGNED: …………………………………………….
……………………
Satisfactory
Unsatisfactory
Satisfactory
Unsatisfactory
Satisfactory
Unsatisfactory
Nozzles (Make/Size/Angle):
Spec No:
Production Date:
BOILER TYPE/DETAILS:
Rating:
BURNER TYPE/DETAILS:
Serial No:
CUSTOMER/SITE ADDRESS:
CONTRACT NO:
Summary of Contents for NOL100-38
Page 22: ...NOL 18 100 HL Page 22 NOTES...
Page 23: ...Page 23 NOL 18 100 HL...