background image

Unit must not be switched off, product is 

designed to run continuously.

3

16. 06. 15. Leaflet Number 671391

Installation and Maintenance

LPXBOXAC-2 Mechanical Ventilation with Heat Recovery

For good EMC engineering practice, any sensor cables 

or switched live cables should not be 

placed within 50mm of other cables or on the same 

metal cable tray as other cables.

Isolation - Before commencing work make sure

that the unit, switched live and Nuaire control are 

electrically isolated from the mains supply.

Please note this product must be earthed. 

N

L

SL

  TRICKLE          BOOST

  

A   B   C

D  E   F   G

3.0 Electrical Wiring 

3.1 Additional Control Wiring Option 

The two fans are pre-wired into an external wiring box for

ease of connection. (see figure 6 for connection details). 

All incoming mains connections must be routed through a

suitable local isolator for maintenance purposes.

Units are supplied configured to run on speeds 1 and 3. 

To change the duty the links may be removed and refitted 

to the other positions. (See table 1).

L

N

2
1

L

N

E

Supply
230V 
50Hz 

3 pole 
isolator

2

1

L

N

Supply fan 
      boost switch     

Extract fan 
      boost switch

3A fuse

All switches by others

Fan unit

Figure 6. 

Table 1.

Figure 7. Circuit Board Connections.

TRICKLE

BOOST

SPEED 1–Link B (As supplied)

SPEED 3–Link D & F (As supplied)

SPEED 2–Link C

SPEED 4–Link G

SPEED 3- Link A & C

SPEED 4–Link G

4.0 Maintenance

It is inevitable that even with filtered extract grilles as 

recommended in BRE digest 398 some dust, fluff etc. will

pass through the filter, and which, if allowed, will build up

internally on motors and impellers, shortening the life of 

the unit and, in severe cases, leading to overheating of the

motors. Consequently, it is strongly recommended that all

units are inspected and cleaned every six months. 

It is recommended that the drip-tray and the heat-exchanger

should be inspected, cleaned and disinfected at regular inter-

vals to prevent a build-up of mould and bacterial growth. 

5.0 Cleaning 

Remove covers and carefully clean out interiors as necessary.

To clean the filter, remove from the unit and wash in tepid

water to which a little mild detergent has been added.

Shake out excess water and allow to dry naturally.  

Replace when dry. Check for damage and security of 

components. Refit covers.

To remove the drip-tray and the heat-exchanger, disenguage

the retainer clips. Take care not to let the drip-tray and the

heat-exchanger drop down. Clean by washing the parts in

tepid water with suitable disinfectant.

Allow to dry naturally before refitting back into the unit.

6.0 Replacement of Parts

Should any component need replacing Nuaire keep extensive

stocks for quick delivery. Ensure that the unit is electrically

isolated, before carrying out any work. 

When ordering spare parts, please quote the serial number

of the unit and the ARC number of the purchase if possible.

(This information will be available on the fan label).

7.0 Warranty

The 5 year warranty starts from the day of delivery and

includes parts and labour for the first year and parts only

for the remaining four years. This warranty is conditional

on planned maintenance being undertaken.

8.0 Service Enquiries

Nuaire can assist you in all aspects of service. Our Technical

Support department will be happy to provide any assistance

required.

Telephone 029 2085 8400

Fax029 2085 8444

Reviews: