background image

Unit must not be switched off during normal operation, the

product is designed to run continuously.

1.0 Introduction

MRXBOX95B-LOFT is designed to provide mechanical supply

and extract ventilation with heat recovery and incorporates

summer bypass. 

The unit is fitted with two independent fans. Each fan has full

speed control for background and boost ventilation rates as

well as a run-on timer facility. To recover heat from the extract

air the heat exchanger block is utilised. This heat exchanger

can recover up to 95% of the normally wasted heat.

The bypass damper opens when a 230V switch signal is

applied to the unit (via a manual switch). This opens the

damper via a wax actuator. When the switch signal is de-

activated the unit returns to its original state (air through 

the heat exchanger).

Outside air supplied through the bypass is still being filtered,

so the air quality is optimal, irrespective of the bypass setting

(Open or closed).

2.0 Installation

Installation must be carried out by competent personnel in

accordance with the appropriate authority and conforming

to all statutory governing regulations.

All mains wiring must be in accordance with the current I.E.E.

Regulations, or the appropriate standards. Ensure that the

mains supply (Voltage, Frequency and Phase) complies with

the rating label.

Please note a clear working space is required around the

installed unit to allow the cover to be removed and provide 

sufficient access for maintenance such as filter change.

The fan must be installed indoors, away from direct sources of

frost, heat, water spray or moisture generation. 

The unit is designed for mounting on the roof joists in the loft

space using four “L shape” metal brackets and four A.V.

mounts supplied with the unit. Please note that various 

positions for the brackets are available to suit different joist

centres.

Connect the four ‘L’ shape fixing brackets to the unit with the 

M4 screws (provided) they can be attached to the long, or

short sides of the unit depending on requirements. Each pair of

brackets should be mounted at different heights so the fall is

towards the drip tray end of the unit. (see figures 2a, 2b and

2c for fixing details). Lower the unit with the “L” shape fixing

brackets attached onto the joists.  Mark through the brackets

and drill four clearance holes into the top surface of joists.

Locate anti-vibration mounts (supplied) above and below each

bracket fixing point hole and, using 4 suitable screws (not 

provided) and washers, fix the unit to the joists (see fig 2b). 

Do not overtighten the fixings. The distance from the top

washer on the A.V. mount to the joist when installed must

not be less than 30mm.

Nuaire Limited

Western Industrial Estate  Caerphilly  United Kingdom  CF83 1NA  

T: 029 2088 5911  F: 029 2088 7033  E: info@nuaire.co.uk  W: www.nuaire.co.uk

1

Leaflet Number 671453 January 2011

MRXBOX95B-LOFT

Mechanical Ventilation Unit with Heat Recovery 

& Summer Bypass for Loft Mounting

Installation and Maintenance

The EMC Directive 
2004/108/EC  
The Low Voltage 
directive 
2006/95/EC

Spigot 1.
(non control 
side).
125mm dia.

Spigot 3.
125mm dia.

Spigot 4.
125mm dia.

Spigot 2.
125mm dia.

Three alternative 
150mm dia knockout 
spigots on rear of unit.

One alternative 
150mm dia knockout
spigot on side of unit.

Figure 1. Airflow through unit.

Spigot Location and Ducting references: 

Spigot 1.

Extract air from kitchen/bathroom.

Spigot 2.

Intake air from outside. 

Spigot 3.

Outside air to house. 

Spigot 4.

Extract air to outside.

Figure 2a. Mounting MRXBOX95B-LOFT onto roof joists using

the ‘L’ shaped fixing brackets and AV mounts with four suitable

screws on the long side of the unit. 

Controls

21.5mm dia.
condensate pipe.

Two fixing
brackets 
should be
attached on 
the non-control
end of the unit
via 

the two 

upper hole
positions.

(see figure 2c).

The two fixing brackets on the control end of the MRXBOX95 unit should be
attached via 

the two lower hole positions.

(see figure 2c).

Summary of Contents for MRXBOX95B-LOFT

Page 1: ...t the four L shape fixing brackets to the unit with the M4 screws provided they can be attached to the long or short sides of the unit depending on requirements Each pair of brackets should be mounted...

Page 2: ...of 90 Deg bends be kept to a minimum 5 Ducting joints must be sealed with duct tape and or silicone sealant For further information refer to Building Regulations Part F and BRE appendix Q website Any...

Page 3: ...n alternative position 125mm dia spigot Alternative 150mm dia spigot 3 alternative 150mm dia spigots on back of unit 3 0 Dimensions mm Figure 4 Main unit components shown with front and lid removed G4...

Page 4: ...other cables 4 0 Electrical Connection Please note the electrical connection of the unit must be be carried out by a qualified electrician The unit is supplied with a flexible cord for connection to t...

Page 5: ...ata Cable installation A 4 core data cable is used to connect devices such as sensors to the fan and for interconnecting multiple fan units Do not run data cable in the same conduit as the mains cable...

Page 6: ...years Generally check for damage and security of components Refit top cover 3 Inspecting motors Motors can be accessed through removal side panels 8 0 Replacement of Parts Should any component need r...

Page 7: ...hange speed This is normal and will have no adverse effect on the fan The speed will return to normal once the interference has subsided 5 0 INSTALLATION REQUIREMENTS In addition to the particular req...

Page 8: ...estern Industrial Estate Caerphilly United Kingdom CF83 1NA T 029 2088 5911 F 029 2088 7033 E info nuaire co uk W www nuaire co uk Technical or commercial considerations may from time to time make it...

Reviews: