5.0 COMMISSIONING
The filters fitted inside the unit are protected with a plastic film.
Prior to commissioning remove the covers (Figure 21), take off the
film and replace.
1. For the required air flow rates please refer to the design specification
for the property, follow 2.4, or refer to building regulations ADF
2010.
2. The unit is supplied with independent control for both normal and
boost airflows (Figure 19).
3. Correct commissioning is essential to ensure the ventilation air flow
rates are met. It also ensures the unit is not over ventilating and
causing excessive power consumption.
4. Commissioning should be carried out in accordance with building
regulations document “Domestic ventilation compliance guide”.
www.planningportal.gov.uk/building regulations/approved
documents/partf/associated.
A calibrated moving vane
anemometer and hood will be required to carry out commissioning.
5. Adjustment valves should be locked in place to prevent further
adjustment.
6. Once commissioned the home owner / tenant should be informed
that the unit should not be adjusted as it will have a detrimental
effect on the indoor air quality and could result in condensation and
mould growth. The clear panel covering the control has an adhesive
panel which should be exposed and sealed post commissioning to
prevent tampering.
7. Speed 1 is limited to never exceed speed 2, when commissioning
speed 2 should always be set first.
5.1 Humidity Adjustment
This product contains an internal humidity sensor fitted into the air-
flow extracting from the wet rooms. When the unit senses that the
humidity exceeds the set point the unit will boost to that set by the
commissioned boost speed. The set point can be found on the front
of the unit (Figure 19) and is at its least sensitive when turned fully
clockwise. Note that the sensor is measuring humidity from all the wet
rooms at the same time and should not be relied on to solely boost the
unit. Additional switch should be used local to the wet rooms (Section
4.2).
19
20
Unit Control On Front Panel
(Standard Configuration Only)
Unit Control On Front Panel
(Standard Configuration Only)
5.2 Status Indication
The status of the unit is indicated by a series of LED’s on the front cover.
The variants are listed below.
The display on the unit control panel will not indicate when a
higher speed setting has been triggered by an external source, such
as an ES-PIR2 etc.
HX Bypass
(AB units only)
Speed 1
Speed 2
Speed 3
Supply Fan Fault
Extract Fan Fault
Frost Protection
Filter Change
5.3 Integral Automatic HX Bypass
Intake and extract temperatures are monitored at the point the
airflows enter the unit, if the range falls within the set parameters the
bypass damper is opened automatically to target an indoor comfort
temperature all year round.
The extract temperature is an average from all wet rooms. If this
exceeds 25°C the unit may go into bypass depending on outside
temperatures.
5.4 Frost Protection
In the event of the intake air temperature at the unit dropping below
the predetermined set point (-5°C as standard) the supply fan will
reduce to minimum speed, once the temperature rises above the set
point the fan will return to its commissioned speed.
Frost protection will only activate after ten days of continuous run
time. If commissioning of the unit is outside of this time frame please
notify the after sales department prior to site visit.
6.0 MAINTENANCE
It is important that maintenance checks are recorded and that the
schedule is always adhered to, in all cases, the previous report should
be referred to.
6.1 Routine Maintenance
•
Clean all areas of unit and treat any areas of corrosion.
•
Check all access doors for leakage and if necessary locks should be
adjusted and any replacement gasket materials should be replaced
as required.
•
Any drain trays should be cleaned and repaired if necessary.
6.2 Every 3 Months
•
Ensure condensate drains are cleaned clear and that water can
flow freely from unit.
6.3 Annually
•
Thoroughly inspect the unit and its components for corrosion,
acting immediately to treat/restore any damaged areas.
•
All electrical terminals within the unit should be tightened.
•
Check all earth connections.
+
-
Post commissioning remove
adhesive backing and seal
Power Fan
Failure
+
-
Ventilation Controls
- +
+
- +
-
Speed 1
- +
Speed 2
Speed 3
Supply Extract Supply Extract Supply Extract
Humidity adjustment