INSTALLATION

NEW HOME CONSTRUCTION

Refer to Figure 5

1.  Cut out wall plate (9) between two studs at the location of VacPan™.  Cut a 6 3/4" piece of wall plate and refasten to floor

temporary rough-in block. (10)  This will act as temporary rough-in block that will force all trades to finish around providing
a slot in wall for installation of VacPan™.  Make certain that screws (11) remain exposed so that block can be removed in
the future.

2.  Flooring contractor must run flooring under block.

3.  Rough-in pipe and low voltage leads (12) to location of VacPan™ outlet.  

Ensure final fitting is installed 1" off finished

floor with 

1

/

2

" of play in piping to allow VacPan™ to be slid into position.

Product specifications subject to change without notice.

4820 Red Bank Road, Cincinnati, Ohio 45227
1140 Tristar Drive, Mississauga, Ontario, Canada L5T1H9
Printed in U.S.A., Rev. 3/02

FIGURE 5

FIGURE 6

1

2

"

FLEX

11

10

12

9

9

12

14

13

6

Refer to Figure 5

1.  If ceiling is installed below and access to pipe is not possible, cut 2 

3

/

4

" X 4 

1

/

2

" access hole (13) in wall above VacPan™

(6).  Reach through access hole, lift pipe and slide VacPan™ into position and push elbow onto VacPan™.  

2.  Cover access hole with cover plate (14).