Figure 1
: Contents of upper termination kit required
to complete the termination procedure.
10
9
18
11
14
15
19
13
12
16
17
Tools required for terminating upper end of
nVent ERICO ERICORE
1. Utility Knife
2. Tape Measure
3. 2 x 375 mm (15 in.) Shifting Spanner / Wrench
4. PVC Electrical Tape
5. Screwdriver
6. Cutting pliers
7. Zip Ties (2 pcs)
8. Desktop or Handheld Heat Gun
The Upper Termination Kit consists of:
9. 900 mm Black Heatshrink
10. 450 mm Black Heatshrink
11. Vital Warning Label
12. ERICORE Coupling
13. Structure Bonding Braid
14. Instructions
15. Insulation Cutting Tool
16. Crimp Lug
17. Silicone Tape - 2.5 m(2 pcs)
18. Semi-conductive Tape (2 pcs)
19. Roll Spring
TECHNICAL SUPPORT
www.nVent.com
IP8519_A
1 OF 11
INSTRUCTION SHEET
nVent, nVent CADDY, nVent ERICO Cadweld, nVent ERICO Critec, nVent ERICO, nVent ERIFLEX, and nVent LENTON are owned by
nVent or its global affiliates. All other trademarks arethe property of their respective owners. nVent reserves the right to change
specifications without prior notice.
WARNING:
nVent products shall be installed and used only as indicated in nVent product instruction sheets and training materials. Instruction sheets are available at
1.
www.nVent.com
and from your nVent customer service representative.
nVent products must never be used for a purpose other than the purpose for which they were designed or in a manner that exceeds specified load ratings.
2.
All instructions must be
completely
followed to ensure proper and safe installation and performance.
3.
Improper installation, misuse, misapplication or other failure to completely follow nVent's instructions and warnings may cause product malfunction, property
4.
damage, serious bodily injury and/or death, and void your warranty.
SAFETY INSTRUCTIONS:
All governing codes and regulations and those required by the job site must be observed.
Always use appropriate safety equipment such as eye protection, hard hat, and gloves as appropriate to the application.