To Upper
Termination
2
.
5
mm
2
(
12
AWG)
Wire Temporarily
Disconnected
Ground Resistance
Meter
LP Downconductor
(Disconnected from
LP Ground)
Structure Bonding Cable
(Disconnected from L P Ground)
LP Grounding System
To Upper
Termination
2
.
5
mm
2
(
12
AWG)
Wire Temporarily
Disconnected
Ground Resistance
Meter
LP Downconductor
(Disconnected from
LP Ground)
Structure Bonding Cable
(Disconnected from L P Ground)
LP Grounding System
Figure
42
: Grounding and downconductor continuity testing
Figure
43
: Grounding and downconductor continuity testing
Reconnect the
2
.
5
mm
2
(
12
AWG) bonding wire to
the hose clamp.
J
Reseal the lower
termination and
grounding connection
in waterproofing mastic
and ensure that the
whole connection is
made waterproof.
L
Report any problems, defects of
inconsistencies to your nearest
nVent ERICO Distributor.
Reconnect the
downconductor lower
termination and structure
ground bonding cable to
the lightning protection
grounding system.
K