38 | nVent.com
Installation and Inspection
Records
11
nVent Heat-Tracing
Installation and Inspection Record
Facility
Circuit number
Heating cable type
Circuit length
Commission
Inspection date:
Visual Inspection
Visual inspection inside connection boxes
for signs of overheating, corrosion, moisture,
loose connections and other problems.
Proper electrical connection, ground, and bus
wires insulated over full length.
Damaged or wet thermal insulation;
damaged, missing, cracked lagging or
weather-proofing; gaps in caulking.
Covered end seals, splices, and tees properly
labeled on insulation cladding.
Control and Monitoring system checked for
moisture, corrosion, set point, switch
operation, capillary damage, and protection.
Insulation resistance (Megger) test
Ohms
Ohms
Ohms
Ohms
Ohms
Test A
500 Vdc
(bus to braid)
1000 Vdc
2500 Vdc
Test B
500 Vdc
(braid to pipe)
1000 Vdc
2500 Vdc
Power check
Circuit voltage
Panel
(Vac)
Circuit end*
(Vac)
Circuit amps after 10 min (Amps)
Pipe temperature
(°F)
Power = Volts x amps/ft (watts/ft)
* Commissioning only