background image

Quick Install Guide - 

CLEER24-10G

System Grounding (Earthing)

Protective grounding conductor

Install the protective grounding conductor to the system.

General grounding

Cabinets always require redundant and independent equipment grounding conductors between the cabinet and the wiring system ground: an insulated grounding 

conductor and a supplementary (protective) ground.

Grounding conductor

The grounding conductor is provided as part of the three-wire, 15-Amp, AC-power cord set included with the equipment. If the power cord must be replaced, use a 
power cord of the same gauge that has the same insulation, number of conductors, and usage ratings.

GROUND ALL SYSTEMS ACCORDING TO THESE INSTRUCTIONS BEFORE YOU CONNECT POWER LEADS. 

FOLLOW INSTRUCTIONS EXPLICITLY TO ENSURE THE SAFETY OF PERSONNEL.

The ground symbol within a circle identifies the terminal to be connected to an external protective conductor. Connect this terminal to earth 

ground before you make any other connections to the equipment. The protective grounding conductor must be: 

• An Insulated wire, #5 (13mm2) to #14 (2mm2) AWG, with green and yellow stripes 
• Connected to the grounding stud on the back of the cabinet.

Technical Specifications

Specifications subject to change without notice.

* No DC power unless supplied by NVT Phybridge power supply units

888.901.3633  |  +44 (0) 208 977 6614 |  www.nvtphybridge.com

Copyright 2021 NVT Phybridge  |  445-0031 REV. B  |  Page 6

Model

CLEER24-10G

Part Number

NV-CLR-024-10G

Dimensions

19 inches x 1U without rack ears:

• 1.73" x 17.13" x 11.22" (HxWxD)

• 4.39cm x 43.51cm x 28.49cm (HxWxD)

Weight

8 lb. (3.63 kg)

Mounting

Standalone, rack or shelf-mountable; 2 brackets included for installation

Processor

MIPS32 24KEc, 500MHz

Interface:

Ethernet Uplink

Maximum 2 uplinks, each 10Gb/s (full-duplex):

2 SFP+ ports: 1000 Base-T/TX/SX/LX/EX/ZX, 10GBase-T/CU/SR/LR/ER/ZR (determined by SFP or SFP+ transceiver module installed),

Ethernet IEEE 802.3z, fiber optic cable/UTP

Note: The management port can be configured to be used as an uplink port, please see the Administration Guide for additional details.

Interface:

Downlink (PoE and IP

to Adapter)

24 x BNC Jacks

Speed: 10/100Mb/s (full-duplex)

PoE Power: 50 Watts Maximum per port

Maximum Distance:

24 x Status LEDs:

Configuration options: Link Activity / Link / Off

Management

1 LAN port (MGMT): RJ45, 10/100/1000 Base-T auto-sensing, IEEE 802.3

1 RS-232 console port: RJ45 to DB9 cable; Baud rate 115200/8/N/1

Note: The management port can be configured to be used as an uplink port, please see the Administration Guide for additional details.

Power Supply*

Hot-Swappable Power Supply Unit

Auto-sensing 100-240VAC, 50/60 Hz

Power Output

1000W max at 100VAC

1000W max at 240VAC

Power Consumption

Idle power draw: 38W

Power Injection (PoE)

DC voltage: 48VDC to 58VDC

PowerWISE

®

Power

Sharing

2 male connectors (rear)

DC IN and DC OUT: 48VDC to 58VDC

Operating

temperature

1000W Load: 14°F to 122°F (-10°C to +50°C)

500W Load: 14°F to 140°F (-10°C to +60°C)

Humidity

10% to 95% (non-condensing) at 95°F (35°C)

MTBF

20 years

Cable

RG59 Coax cable

RG59 Coax cable

RG6 Coax cable

RG6 Coax cable

RG11 Coax cable

RG11 Coax cable

Data Rate

100Mb/s

10Mb/s

100Mb/s

10Mb/s

100Mb/s

10Mb/s

Reach

1,500ft (457m)

4,000ft (1,220m)

2,000ft (610m)

6,000ft (1,830m)

3,000ft (915m)

6,000ft (1,830m)

Summary of Contents for CLEER24-10G

Page 1: ...pt Finland Norway and Sweden where in these 3 Nordic countries it must be installed in a restricted access location CLEER24 10G kan installeras på valfri plats inomhus i samtliga länder utom Finland Norge och Sverige i dessa nordiska länder måste den installeras på en plats med begränsad åtkomst CLEER24 10G kan installeres overalt indendørs undtagen i Finland Norge og Sverige hvor i disse tre nord...

Page 2: ...used To use DHCP enable the DHCP toggle 4 Type in the new IP address of the default gateway into the Default gateway field 5 Click the Apply button next to any fields which were modified 6 Refer to the Administration Guide for more software details Connecting to CLEER24 10G 1 Change the IP address of your PC or Laptop to 192 168 1 2 2 Connect your Ethernet port on the PC or Laptop to the MGMT port on...

Page 3: ...mpérage ATTENTION La cosse de terre est une borne de terre principale qui doit être connectée en permanence à la terre El servicio de antenimiento y reparación de esta unitad solo puede ser realizado por técnicos autorizados por el fabricante Esta unidad puede tener más de una entrada de energía Para reducir el riesgo de peligro de descargas eléctricas o descargas eléctricas desconecte todas las e...

Page 4: ...taande ruimte rondom alle kanten van het apparaat worden aangebracht De stekker moet dichtbij de uitrusting worden geïnstalleerd en zijn gemakkelijk bereikbaar Om het risico op schokken of brandgevaar te voorkomen vervang de zekering met hetzelfde type en de waarde VOORZICHTIG De grondvliegtuig is een hoofdterminal die permanent op aarde moet worden aangesloten Tilgang til det indre av denne enhet...

Page 5: ...ns fyrir þjónustu Til að tryggja fullnægjandi kælingu búnaðarins verður að vera með 2 tommu óhindrað pláss fyrir alla hliðum tækisins Rafmagnstengi skal komið fyrir nálægt búnaði og skal vera aðgengilegur Til að koma í veg fyrir hættu á losti eða eldhættu skal skipta um öryggi með sömu tegund og einkunn VARÚÐ Jörðin er aðal jarðstöðvar sem verður að vera varanlega tengdur við jörðina Aċċess għall ...

Page 6: ...3 x 11 22 HxWxD 4 39cm x 43 51cm x 28 49cm HxWxD Weight 8 lb 3 63 kg Mounting Standalone rack or shelf mountable 2 brackets included for installation Processor MIPS32 24KEc 500MHz Interface Ethernet Uplink Maximum 2 uplinks each 10Gb s full duplex 2 SFP ports 1000 Base T TX SX LX EX ZX 10GBase T CU SR LR ER ZR determined by SFP or SFP transceiver module installed Ethernet IEEE 802 3z fiber optic ca...

Reviews: