NXP Semiconductors
UM11587
KITVR5510xA0EVM Evaluation Kit User Guideline
5. Select the config source as “script” and locate the *.txt OTP file that was previously
created using the OTP tool.
Figure 20. Selecting the config source as “script”
6. To program the main and fail-safe OTP fuses together or separately, check or
uncheck the sequential programming option. If programming separately, then select
the target state machine and click the program button. Follow the instructions.
7. If the OTP fuse burning was successful, the progress is updated and the fuse box
status is automatically updated.
Figure 21. Fuse box status
8. Remove the jumper on J11 or set SW5 low to exit the debug mode. The part must
turn on with the new OTP settings burnt with above steps. To verify successful OTP
UM11587
All information provided in this document is subject to legal disclaimers.
© NXP B.V. 2021. All rights reserved.
User manual
Rev. 1 — 3 May 2021
26 / 32