6
Chapter 3. Installation and
Operation
Note: The packing condition and the external outlook
of the unit should be inspected carefully before
installation. Retain the packing material for future use.
3.1. Unpacking
Remove the packing foams and take the battery bank
out of the box.
Warning:
The unit could be quite heavy. Check the
weight of the unit before operating to avoid injury.
Standard Package includes
-
User's Manual
Accessories for Tower and Rack Mount
x2
x2
x1
A2
x4
Summary of Contents for NPB12-36R
Page 1: ...0 Battery Bank Installation User s MANUAL NPB12 36R...
Page 8: ...7 C1 6 Pin Anderson Fixing pieces M3x6mm x16 M4x8mm x6 S3 x2 M3x6mm...
Page 11: ...10 3 3 Installation Instructions 3 3 1 Tower installation Stand alone unit...
Page 12: ...11 with UPS...
Page 14: ...13 Step 3...
Page 15: ...14 3 3 3 Connect DC Cable 6P UPS First Battery Bank Second Battery Bank...
Page 17: ...16 Step 2...
Page 18: ...17 Step 3...
Page 22: ...23 192321752083003...