8
3.2. Selecting Installation Position
It is necessary to select a proper environment to
install the unit, in order to minimize the possibility of
failure to the battery bank and extend the life of the
batteries. Please follow the instructions below:
1. Keep at least
20cm (8
inches)
clearance from
the rear panel
of the battery
bank from the
wall or other
obstructions.
2. Do not block
the air-flow to the ventilation openings of the unit.
3. Ensure the installation site environmental
conditions are in accordance with the battery bank
working specifications to avoid
overheat and excessive moisture.
Summary of Contents for NPB12-36R
Page 1: ...0 Battery Bank Installation User s MANUAL NPB12 36R...
Page 8: ...7 C1 6 Pin Anderson Fixing pieces M3x6mm x16 M4x8mm x6 S3 x2 M3x6mm...
Page 11: ...10 3 3 Installation Instructions 3 3 1 Tower installation Stand alone unit...
Page 12: ...11 with UPS...
Page 14: ...13 Step 3...
Page 15: ...14 3 3 3 Connect DC Cable 6P UPS First Battery Bank Second Battery Bank...
Page 17: ...16 Step 2...
Page 18: ...17 Step 3...
Page 22: ...23 192321752083003...