This article describes how your equipment will be delivered to you, specifications on the transportation
used and advice including health & safety on movement of the equipment.

The manufacturer will use a qualified transport company to deliver the product conforming to the
necessary regulations as detailed below:

?

  All drivers are qualified

?

  All drivers are tested once yearly ( If applicable )

?

  All drivers carry risk assessments and method statements (available on request)

?

  They are controlled under law to conform as there are no trade regulation standards to comply with

Health and safety Considerations:
Moving Goods Safely (MGS) is a national project involving both the Health and Safety Executive (HSE) and
Local Authorities (LA) working in partnership. The project aims to reduce injuries and ill-health arising from the
movement of goods from supplier through haulier to the recipient and end user including any home deliveries.
The project will focus upon the delivery and collection of goods and the hazards this generates. It covers the
main areas that cause the majority of injuries and ill-health to workers, including:

?

  Workplace transport;

?

  Slips & trips, and;

?

  Musculoskeletal disorders (MSD).

The movement of goods presents us, as health and safety regulators, with the challenge of dealing with a huge
variety of issues. The commercial organisations involved within the movement of goods are diverse including
haulier,  third  party  logistics  providers,  pallet  networks,  retailers  etc,  with  some  very  large  companies,
thousands of small businesses and the self-employed. The movement of goods is more than just trucks on the
road with a large proportion of accidents happening at the delivery/collection sites that are often not directly
under the control of the company making the delivery or collection. Communication and cooperation problems
can arise due to the many organizations involved in the movement of the goods, and this can also lead to
difficulties in effectively managing health and safety.
(Source H&S Executive UK 2008)

The barrier should ALWAYS! be moved with care and attention. The products are very heavy individually
as well as a whole. Y ou should not attempt to move this or any other products by unapproved handling
methods.

Transport and Handling.

D

3250

Summary of Contents for D3250

Page 1: ...Maximum span 7 0 100 Duty cycle Automatic Barrier d3250 Made in the...

Page 2: ...07 09 7 Commissioning Certificate Page 10 8 Manual release Page 11 9 Terminal connections Page 12 10 Control panel layout Page 13 11 Using the controller Display Page 14 12 Barrier Parameters Page 15...

Page 3: ...ade to be 100 accurate in this manual but we cannot make any guarantees As we constantly innovate our products we may change the quoted spec and any other details that have been documented in this man...

Page 4: ...It covers the main areas that cause the majority of injuries and ill health to workers including Workplace transport Slips trips and Musculoskeletal disorders MSD The movement of goods presents us as...

Page 5: ...installation of a D3250 Automatic barrier for a single entrance Control Dual height Card access entry Loop safety lower with Auto loop exit Shown above is a very basic layout There are many types of...

Page 6: ...General Layout Foundation drawing D3250...

Page 7: ...order as they are referred to throughout this manual note this can change per barrier spec i e manual components are different from automatic Barrier Cabinet c w Pole Arm Adaptor End Rest Pole if ove...

Page 8: ...ater Then after checking the barrier is Still in line and level proceed to drill and bolt in the Rest of the fixing bolts Once all bolts are in make Sure they are tightened down Guide to Physical Inst...

Page 9: ...in shaft that operate the limit Switches These are what you may need to adjust For example if the pole is stopping short of its tip Support in the lower position then you will need to Back the lower s...

Page 10: ...ineers Installing Commissioning Equipment Fitted Handover Date Part 2 Existing Installation Items not covered under warranty This certificate Installers Name On Behalf of Address Signature Date of Sig...

Page 11: ...every 6 months or sooner dependant on use Barrier will not work properly without photo cell function Have a qualified technician installer check the correct setting of the electric clutch If the power...

Page 12: ...rier 17 Connect to terminal 5 in slave barrier 18 Connect to terminal 4 in slave barrier 19 Connect to terminal 3 in slave barrier When used as a Master Barrier below terminals will be situated on the...

Page 13: ...yout 240v Terminals 240v Breaker 24VDC Power supply PLC Inverter Loop Detector Low voltage terminals 24v Fuse 1Amp Programming screen Above shows a typical barrier control panel layout which identifie...

Page 14: ...interface You will see the screen shown in The left diagram which shows Settings you can alter One very Useful feature is the R4 and R3 Key can raise and lower the barrier As shown in the bottom righ...

Page 15: ...network cable this Option turns on the outputs to run an inverter hard Wired OFF Raise Timeclock This turns ON the raise timeclock which will hold the Barrier up at set times of the day See timeclock...

Page 16: ...change D3250 Barrier Timers Lower delay Slow down delay Traffic light delay Lower delay No pass delay Slow down delay Delays the traffic light from going Straight to green once the gate has fully open...

Page 17: ...eriod 1 Select Alarm On Time Off Time 0900 1700 In Range 0 When you select a period time set it will Take you to the on off time for that Period you can now set the times you Need the barrier to stay...

Page 18: ...Open Motor controller close direction Active to lower barrier Q3 Normally Open Boom Lights Active to operate boom lights Q4 Normally Open Traffic light relay Active when green light in Q5 Normally Ope...

Page 19: ...Blank screen on PLC but power to other devices in the control panel On board fuse blown Replace fuse and reset barrier PLC has developed an electrical fault or had a power spike Change PLC Barrier do...

Page 20: ...the photocell optical components and make sure they are free from dirt water rain soil etc Batteries in photo cells may need to be changed every 6 months or sooner dependant on use Barrier will not wo...

Page 21: ...e repair work is carried out on the product This is to achieve two things 1 To keep a history of the product for yourself and your supplier manufacturer 2 To keep an accurate log of any historical or...

Page 22: ...5 Amps Drive Motor 3 Phase motor wormed gearbox Opening Closing time 1 5 7 0 seconds Duty Cycle 100 continuos duty rating Operation Time 8 Seconds per metre Variable Finish Polyester Powder Coated Di...

Reviews:

Related manuals for D3250