1
When delivered, the barrier will arrive
On a pallet. Make sure you check
Before you sign! Take care when
Unpacking not to damage the barrier.
Once the barrier has been lifted onto the plinth,
Align the pole arm adaptor with the centre of
The tip support. Ensure both barrier and tip
Support are level ready for bolting down.
2
Component Identification and Notes:
You should check that you have received the following in your order as they are referred to throughout this
manual (note this can change per barrier spec i.e. manual components are different from automatic):
Barrier Cabinet
c/w Pole Arm Adaptor
End Rest
Pole , if over 6m then it will have
Strainer wire attached to it.
Box of bits C/w
4 x M16 parabolts
4 x M12 parabolts
2 x M6 x 90 pole bolts
1 x cabinet key
O and M manual
O&M Manual
Revision 1.2
Follow the steps below for Installation.
Please note all installations should be carry out by a competent person and all electrical
Connections should be made by a qualified electrician.
Guide to Physical Installation.
Top View
Level
D
3250