Header mechanism / Manual release guide

PF4000FH

6

Turnstile Maintenance

PF4000FH

This is a brief overview of the workings and location of parts on the header
mechanism and how to set the turnstile in manual mode:

As stated at the beginning of this manual we recommend a bi-annual service, but at a bare minimum, it is imperative 
that you get a service done once every 12 months. This is not a sales tactic in disguise, there is a very serious 
health and safety issue/risk associated with not complying to this. Also in order for your equipment to keep 
complying with the appropriate legislation.

Before carrying out any maintenance to the installation, disconnect the mains power supply.

1. All moving mechanical header parts should be greased once every 6 months
2. Rotor arm rotation checked and secured.
3.  All ground fixing nuts to be checked for corrosion.
4.  All ground fixing nuts should be checked for tightness and secure the turnstile two the ground.
5.  All electrical connections should be checked in accordance with the latest safety standards.
6.  All welds and interconnecting parts should be checked for tightness and security.
7.  Any defects or failure in the coating of the turnstile should be noted and reported immediately to the seller or 

manufacturing company.

8.  Rotor arms should be checked for correct function and angle these should be corrected as needed.
9.  The turnstile should be checked for any abnormalities that may cause harm or defect to an object or person.
10.  The turnstile control board wiring and general condition should be checked.
11.  The turnstile header mechanism should be checked for general condition and mechanical functions to ensure 

correct operation.

12.  All solenoid's and limit switches should be checked for correct operation.

3.

4.

1.

2.

10 mins

60 5

10

15

20

25

30

35

40

45

50

55

!

Header housing

Manual rotate exit key

Manual rotate entry key

Directional LED’s

Upright bolted 
to housing

Exit directional
LED’s

Central rotor

Rotor arms

Turnstile housing

Manual rotation unlock keys

Note: the keys may not be inserted as shown into the diagram above. The
keys will be strapped to the turnstile frame when sent out for delivery. 

20x Zoom Showing Key Operation

To Manually release the turnstile
turn the key shown a quater turn
clockwise. Do not force the key it
only takes a quarter turn release! 

Open

Close

Summary of Contents for PF4000FH

Page 1: ...PF4000FH PF4000FH Automatic Full height Turnstile Single or Double Duty Cycle 100 GB O M Manual Revision 4 1...

Page 2: ...mentation Any other use not specified in this documentation could damage the product and be dangerous The Company declines all responsibility for any consequences resulting from improper use of the pr...

Page 3: ...ising from the movement of goods from supplier through haulier to the recipient and end user including any home deliveries The project will focus upon the delivery and collection of goods and the haza...

Page 4: ...M12 bolts see below Now move on to step 5 The numbers in the text document below relate to the drawings below 3 1 2 4 45 mins Component Identification and Notes You should check that you have receive...

Page 5: ...andard and if not required should be made clear at the point of order 9 Now connect all power and access control using the wiring diagram on page 8 For any other specific wiring access control wiring...

Page 6: ...rconnecting parts should be checked for tightness and security 7 Any defects or failure in the coating of the turnstile should be noted and reported immediately to the seller or manufacturing company...

Page 7: ...as you may risk wiping the memory 10 Press menu ok button Green Button 11 When downloaded TRANSFER OK STOP LD will be displayed 12 Press menu ok button 13 Scroll up to run stop flashing 14 Press menu...

Page 8: ...8 Wiring Diagram Illustration PF4000FH...

Page 9: ...9 Wiring Diagram Schematic PF4000FH...

Page 10: ...VICES OPERATING THROUGH EXTERNAL SOURCES MUST NOT BE RECEIVED FROM THE PLC INSIDE THE TURNSTILE POSOTIVE 24VDC INPUT NEGATIVE 24VDC INPUT I1 LOCK I2 ENTRY SIGNAL I3 EXIT SIGNAL I4 ENTRY LIMIT IB EXIT...

Page 11: ...ations can vary depending on model spec Limit Switches Solenoid Header Shaft Limit Striker Solenoid Paddle Lever Adjusting Cams Ratchet Cog Paddle Levers Solenoid Solenoid Paddle Levers Paddle Levers...

Page 12: ...ile arm using the PLC first make sure the screen says RUN LD if it does not follow the troubleshooting guide on page 11 when the screen says RUN LD follow below 3 4 To make the Turnstile move upwards...

Page 13: ...mally Open Q2 1 24v Common Q2 2 Exit Solenoid Active to close Turnstile Q3 Normally Open Spare Spare Not Used Q4 Normally Open Spare Spare Not Used The table bottom relates to the diagram directly bel...

Page 14: ...Cable of direction sensor may be displaced from connector on the electronic card 3 One of the direction sensors may be broken down 1 Broken cables if any are soldered The unit is cleaned from the dus...

Page 15: ...in 2 Microcontroller and ULN 2803A circuit or electronic board is replaced with a new one After passage is done arms do not finalise the movement and do not settle to their place 1 Balance arm spring...

Page 16: ...in accordance with the following documents Document Ref Revision Description Pf4000 O M 3 0 System guides and drawings as defined within O M Manuals Part 4 The following test schedules refer Test Sche...

Page 17: ...ons undertaken Product works the way site need it to this includes no passage time out etc System has had the completed conformity certificate All items on the delivery note have been handed over to c...

Page 18: ...w at any point service repair work is carried out on the product This is to achieve two things 1 To keep a history of the product for yourself and your supplier manufacturer 2 To keep an accurate log...

Page 19: ...ectromagnetic Compatibility Directive 89 336 CEE And is in conformity with the following standards other specifications EN292 1 1991 Machinery basis terminology methodology EN292 2 machinery technical...

Page 20: ...Made in the UK Proudly Made in the UK PF4000FH Accessories Specification Power Requirement Arms and body Duty Cycle Flow Rate Key Points Access Controls 220v Single Phase 50Hz 5 Amps Primed Powder Co...

Reviews:

Related manuals for PF4000FH