background image

 

We reserve the right to modify product specifications without prior notice.

 

FV103

-

INS

-

03 2822 © Oasis Engineering Limited

 

Servicing - Assembly 

2. Discard damaged vent stub. 

 

1. Remove damaged vent stub.

 

2. Torque new vent stub to 35 Nm.

 

1. Insert new vent stub.

 

21mm spanner 

21mm spanner 

Servicing 

Disassembly 

Summary of Contents for FV100 Series

Page 1: ...death Oasis products must be installed operated and maintained by trained and competent personnel in accordance with all applicable local codes rules and regulations in addition to the Oasis Instruct...

Page 2: ...ing High pressure gas and gas equipment can cause serious harm to both infrastructure and personnel if safety precautions are not followed Oasis recommends considering the use of the following PPE whe...

Page 3: ...g Limited Servicing Tools Required For Servicing Spanner Wrenches 21mm Sockets 21mm Torque Wrench Service Kit Parts 1 x FV103 62 Vent Stub with O ring The Complete Oasis Seal Kit must be used We reser...

Page 4: ...ations without prior notice FV103 INS 03 2822 Oasis Engineering Limited Servicing Assembly 2 Discard damaged vent stub 1 Remove damaged vent stub 2 Torque new vent stub to 35 Nm 1 Insert new vent stub...

Page 5: ...cturers instructions Test for 1 minute 6 Test for leaks before use place fill valve and nozzle in bucket of water with valve open and look for bubbles Use snoop or soapy water for unsubmerged connecti...

Page 6: ...se manufacturers instructions 6 Test for leaks before use place fill valve and nozzle in bucket of water with valve open and look for bubbles Use snoop or soapy water for unsubmerged connections 3 Att...

Page 7: ...o receptacle 4 Lift up lever CLICK 6 Pull nozzle sleeve back to disengage 5 When filling is complete shut off the lever P30 or P36 ON OFF Move handle in one swift motion 3 The green indication sleeve...

Reviews: