background image

4

IMPORTANT REQUIREMENTS

QUASAR UV-C LED OPERATION

CAUTION: 

Ensure bottle filler is properly grounded.  It is required to attach the 

long green ground wire to the frame assembly junction box in order for the unit 

to function properly.  Refer to the steps described in Step 4 on Page 12.

CAUTION:

 Do not activate bottle filler electric eye sensor without running 

water through the UV-C module.  Operating the UV-C module dry may 

damage the UV-C LED’s.

A.

B.

C. 

D.

E.

QUASAR is a form of dispense point water treatment that utilizes UV-C LED’s to inactivate 

pathogens. 

 

Operation:

The QUASAR activation is automatic.  The UV-C LED’s turn ON when water is dispensed 

and OFF when the dispense stops.

During non-use periods the QUASAR automatically cycles ON for ten seconds every ten 

minutes.  This keeps the dispense point more sanitary between use.

When the QUASAR is ON, the LED light on the front of the alcove near the top will turn 

ON.  The LED will be BLUE when the QUASAR is working properly.

If QUASAR is not working properly, then the LED light on the front of the alcove near the 

top will be RED or YELLOW.  The light will remain ON and the system will not allow water 

to be dispensed until the problem is resolved.

IMPORTANT:

  Never operate the QUASAR without water connected to the system.  Lack 

of water can cause the QUASAR to overheat.  If it is necessary to activate QUASAR to 

purge the system of air, then the QUASAR will automatically shut off if it overheats.  But 

the module will resume operation once water begins to flow through it.

Summary of Contents for MWEBQ

Page 1: ...Electronic Bottle Fillers MWEBQ MW8EBQ MW12EBQ MWSMEBQ MWSM8EBQ MWSM12EBQ M8EBQ M12EBQ MF2EBQ MW8F2EBQ MW12F2EBQ MWSMF2EBQ MWSM8F2EBQ MWSM12F2EBQ M8F2EBQ M12F2EBQ Please read these instructions befor...

Page 2: ...te f As the bottle filler panel assembly is being placed on the frame assembly feed the long green ground wire and the terminals on the power supply cord through the bushings in the frame assembly g A...

Page 3: ...catch water and remove drain plug 6 MAINTENANCE systems with chiller The only maintenance required is the removal of dirt and lint from the condenser Inspection should be made at 3 month intervals Re...

Page 4: ...the dispense stops During non use periods the QUASAR automatically cycles ON for ten seconds every ten minutes This keeps the dispense point more sanitary between use When the QUASAR is ON the LED li...

Page 5: ...No action needed YELLOW BOTTLES SAVED Standby mode filter life 80 used but 100 Order new filter RED BOTTLES SAVED Standby mode filter life 100 used Replace the filter BLUE UVC DISINFEC TION IN PROCES...

Page 6: ...TE DRAIN HEIGHT 4 5 16 110 21 7 32 539 FRAME 3 1 2 89 2 5 32 55 8 1 16 205 3 1 16 78 1 1 2 38 5 16 8 DIA MOUNTING HOLES 4 TOP AND 4 BOTTOM NOTES RECOMMENDED ADULT HEIGHT INTALLATION SHOWN ADJUST VERTI...

Page 7: ...1 16 78 8 1 16 205 1 1 2 38 ELECTRICAL CONNECTIONS 5 11 32 136 3 1 2 89 9 7 8 251 ELECTRICAL OUTLET OPTIMUM LOCATION SEE NOTE 4 11 1 2 292 44 11 16 1135 VERSAFILTER III APPROX LOCATION IF APPLICABLE I...

Page 8: ...ONS AS REQUIRED TO COMPLY WITH FEDERAL STATE AND LOCAL CODES STOP VALVE TRAP PIPE CONNECTOR TO WASTE LINE NOT PROVIDED SHORT RADIUS TRAP REQUIRED ALL DIMENSIONS ARE IN INCHES DIMENSIONS IN ARE IN MILL...

Page 9: ...g angles 2 provided Cooling Unit mounts inside cradle Lower Front Panel mounts to frame with bottom screws or optional locks 2 provided Trim Bezel accessory on surface mount models only MWSMEBQ MWSM8E...

Page 10: ...efore continuing with step 1B Place drip tray in frame but do NOT fasten in place Do NOT place grille on tray until last step Section 6 Install snap bushings Install provided ball valve and 3 8 O D co...

Page 11: ...tall Provided Stem Elbows Cut water line shown from solenoid valve out to bottle filler delivery fitting Squeeze end of tube back to round shape as needed Connect tube from solenoid valve out to filte...

Page 12: ...d to be connected to a ground fault circuit interrupting GFCI device to meet UL requirements It is recommended that a flexible conduit be used to supply power to the junction box and chiller if used C...

Page 13: ...frame per rough in drawing Screws Provided 4 Place chiller in frame Install 1 4 union fittings on chiller inlet and outlet Connect water line from bottle filler solenoid valve out to chiller water in...

Page 14: ...low Screw provided Install the 1 4 stem elbows provided in filter Inlet and outlet Place the filter in clip as shown Cut water line from buttle filler solenoid valve out to connect to filter in Squeez...

Page 15: ...to the chiller in the location shown on PAGE Install stem elbows provided on the in line filter and place in the in line filter in the previously installed clip Mount the VersaFilter III in the locat...

Page 16: ...ch remaining tubing from ball valve to chiller inlet Remove reducer fitting and copper tube from fountain water line Install provided 1 4 union Determine length of tube needed to connect bottle filler...

Page 17: ...me but do NOT fasten in place Do NOT place grille on tray at this time Install Snap Bushing and any other accessories included Uncoil EBQ push button wire lead and route through same opening in frame...

Page 18: ...or 3 seconds to reset Gallon or Liter count or momentarily press to advance to next menu FILT CAPAC OF 4750 GAL 18000 LTR Depress button for 3 seconds to change filter capacity to 1250 GAL 5000 LTR fo...

Page 19: ...19 SECTION 8 PARTS BREAKDOWN 1 2 8 3 4 6 5 7 28 9 10 15 16 18 24 20 21 17 22 11 12 13 19 23 14 25 26 27...

Page 20: ...05 1 12 LOCK ASSY 031657 006 2 13 POWER SUPPLY 12VDC 038036 003 1 14 PCB IR SENSOR 042065 001 1 15 LENS PWEBF LCD 042575 001 1 16 SPOUT 042368 001 1 17 LEAD WIRE ASSY 10FR BLACK 017340 512 1 18 LEAD W...

Page 21: ...21...

Page 22: ...Modular Series Electronic Bottle Fillers www oasiscoolers com 1 800 646 2747 2022 LVD Acquisition LLC OASIS QUASAR Aqua Pointe remedi Versafiller and Versafilter are registered trademarks of LVD Acqui...

Reviews: