background image

1

These guidelines are recommended for 

the proper installation of Oasis products. A 

careful review of these procedures (and any 

referenced publications) before starting is 

important in avoiding an improper assembly 

and/or installation.

NOTE: All illustrations in this publication are 

typical, and may appear different than the 

actual product. Optional items may also be 

shown that were not ordered on the product 

being installed.

Special Notes to Installer

u

  It is the sole responsibility of the installer 

to determine the requirements necessary for 

compliance with all installation code require-

ments!

u

  All paperwork packaged with the product 

should be saved and presented to the home 

owner upon completion of the installation!

u

  All published product dimensions are 

for reference only. Any critical dimensions 

required for installation should be taken 

directly from the product being installed!

u

  Any independent modifications made to 

the product (or any options / accessories 

supplied) beyond those required for normal 

installation can void all warranties! (Refer to 

warranties for further information)

INSPECTION GUIDELINES

Carefully check the unit upon receipt.  Notify 

your supplier immediately if any questions 

or problems are encountered during this 

process.

DO NOT INSTALL PRODUCT 

WITHOUT FIRST ADDRESSING 

QUESTIONS WHICH ARISE DURING 

THE INSPECTION!

Basic Module Check

l

  Check unit drain position for match to 

bathroom drain location.

l

  Check unit for surface damage.

l

  Check unit color for coordination to other 

bathroom fixtures.

l

  Check unit for specified optional items 

and/or packages.

INSTALLATION SITE FRAMING

The recommended framing and dimensional 

requirements shown are for a traditional 

application and may vary, based on site 

requirements.

The dimensions shown in the dimensional 

diagram(s) are from the surfaces where 

the unit will be attached. This surface can 

be bare studding, dry wall or other suitable 

under layment material.  It is important that 

the floor and all framing be square and 

level. Framing must be done using accepted 

materials and construction techniques in 

accordance with all applicable codes for the 

site.

NOTE: Any pre-constructed wall(s) may 

require modification or additional framing to 

allow for factory applied pipes and/or fittings 

which may protrude from the body of the 

unit.

End Drain Shower Base Installations

 

SB-6030R/L   

SB-6032R/L 

SP-60R/L  

  SP-SB-7v2R/L 

SP-MB-6R/L 

  

®

SP-60R  

SP-60L  

SP-SB-7v2R

SP-SB-7v2L (shown)

SB-6030R (shown) 

SB-6032R

SB-6030L SB-6032L

SP-MB-6R

SP-MB-6L (shown)

Reviews: