background image

3

INSTALLATION PROCEDURE

NOTE: ‘Wet-set’ is not required to support 

the floor under an Oasis product due to the 

encapsulated Balsa wood construction.

With the unit positioned in the framed area, 

several details must be

 

checked prior to 

securing the unit. (Illust. 2 & 3)

l

  Confirm the apron/dam is resting flush 

on the floor.

l

  Confirm drain position.

l

  Confirm the unit is level along each side 

and across each end.

l

  Confirm the unit is square in the framed 

installation area.

l

  Confirm both inside front corners are 

plumb at each end. (This is critical for 

proper door installation) 

NOTE: The use of a shims behind the nail-

ing flange may be required to ensure the 

unit remains square.

After the unit is confirmed level and square 

within the framing, drill a 1/8” hole through 

the nailing flange at each framing member. 

Secure the unit in place across the back 

nailing flange first, followed by the sides 

and then along the front vertical flanges 

(if applicable), using 1-1/4” long nails or 

other appropriate fasteners (illust. 4 & 5). 

Continually check to make sure the unit 

remains plumb within the alcove as it is be-

ing secured. 

NOTE: Usage of a thin shield to protect the 

unit surface while fastening the unit to the 

framing is recommended.

WARNING!

THE INSIDE UNIT SURFACE SHOULD

BE CLEAR OF ALL LOOSE DEBRIS

AND THE  SURFACE PROTECTED

BEFORE STEPPING INSIDE.

Water Supply and Drain Connections

Refer to, and follow, the assembly and 

installation instructions provided with the 

supply valves and drain system. Carefully 

check all connections for leaks.

Finishing Guidelines

Filler strips or filler material may be required 

over the framing to ensure the under lay-

ment mounts flush over the flanges. A water 

resistant under layment is recommended 

surrounding the unit. Stop the under lay-

ment 1/16 to 1/8-inch from the unit surface, 

and fill the space with a continuous bead of 

water resistant sealant. (Illust. 6)

NOTE: Oasis recommends a high qual-

ity silicone based sealant with a mold and 

mildew resistant content.

Use care when fastening the under layment 

near the unit surface to avoid damage. Seal 

the under layment seams and edges, as 

required, and install the finish material to 

specifications. 

UNIT SURFACE CARE

WARNING!

NEVER USE ABRASIVE MATERIALS,

OR ABRASIVE CLEANERS

ON THE UNIT SURFACE!

EXTREME CAUTION is urged regarding  

the use of any cleaner, acid or solvent 

on the unit surface. 

 

READ AND FOLLOW PACKAGE 

INSTRUCTIONS FOR ALL 

PURCHASED CLEANING PRODUCTS!

Through routine use, the unit surface can 

collect residues from soap, bath additives 

and natural body oils. Additional deposits 

can also collect from minerals or particles 

found in the water. After each use, wipe the 

excess water from the unit.This practice 

will reduce the buildup of deposits and help 

maintain the natural unit lustre.

Following a thorough surface cleaning, 

an application of quality automotive wax 

will help reduce major accumulations. The 

actual schedule for cleaning and waxing will 

depend on unit usage and water quality.

WARNING!

NEVER APPLY WAX

TO THE UNIT FLOOR!

u

  Routine Cleaning: Mild, non-abrasive 

cleaner specifically formulated for gelcoat 

and acrylic surfaces recommended. (Rinse 

surface thoroughly)

u

  Heavy Soap Deposits: Liquid ammonia 

household cleaner, applied full strength. 

(Rinse surface thoroughly)

u

  Stubborn Stains: Liquid household 

cleaner or hydrogen peroxide applied 

full strength. Place a saturated clean rag 

directly on stain and let stand several hours. 

(Rinse surface thoroughly)

u

  Hard Water Scales: Liquid scale remover 

or white vinegar, applied full strength. 

(Rinse surface thoroughly)

Nailing

Flange

Wall

Framing

2. Level Unit

In Framed Area

Confirm unit is level

across the front and 

at each end.

Wall Framing

1. Position Unit

In Framed Area

Wall Framing

Confirm unit apron is

resting flush on floor.

Nailing

Flange

Wall

Framing

Confirm Drain Alignment

Illustration 2 - 

Unit Installation

Illustration 3 - 

Unit Installation

Reviews: