background image

16 

 

6.

 

The surface guarantee does not apply to installations exposed to any type of chemical that 
may cause corrosion, such as smoke and rainwater containing carbon, deposits or particles of 
heavy metals, alkaline products such as ash, cement or animal excrements, or to installations 
located in the vicinity of a sewage treatment plant. 

7.

 

The visual appearance of the cutting edges and the discoloration of the zinc surface due to 
water runoff from cutting edges or adjacent parts is not covered by the surface warranty. 

8.

 

The warranty does not apply to areas with high zinc abrasion (desert areas, areas with sandy 
soils and strong winds). 

9.

 

The mounting system must be inspected annually by the customer or his vicarious agent. Any 
damage detected must be repaired (scratches, dents, etc.) The entire system must be serviced 
annually  in  accordance  with  Oberhauser's  assembly  instructions  and  the  assembly  and 
maintenance  instructions  contained  therein.  The  customer  or  his  vicarious  agent  or  his 
representative is responsible for this. 

10.

 

All our warranty services are subject to full payment of the purchase price by the customer. 
They exist within the granted period from the day of building approval, but at the latest from 
the day of final invoicing. 

11.

 

These  conditions  are  a  complete  part  of  the  contract  concluded  between  Oberhauser  Bau-
Systeme GmbH and the customer. 

 

6. 

Safety and liability

 

6.1 

Electrical installation

 

Our assembly instructions do not provide any electrical installation instructions, but are exclusively 
dedicated to the assembly of the substructure and the modules for a PV system. 

Therefore we do not assume any liability for damages caused by the electrical system. 

However, you should observe the following instructions: 

  Installation and commissioning should be carried out by qualified electricians. 

  Observe valid regulations and safety instructions. 

  Do not carry out electrical installation in damp conditions. 

 

Even  low  lighting  can  lead  to  very  high  DC  voltages  at  the  connection  of  solar 
modules and can therefore be life-threatening if touched! 

 

 

 

6.2 

Safety at work

 

The valid accident prevention regulations should be observed and followed for all types of work. 

In addition, only tested power tools should be used and the danger area should be cordoned off. 

In order to avoid injuries, sufficient personal protective equipment such as safety shoes, appropriate 
work clothing, work gloves, safety goggles, helmet, etc. must be used. 

Information can also be obtained from the building trade association. 

Summary of Contents for FRTSTV

Page 1: ...Installation Manual Art Nr FRTSTV Open Land System ISYS 1 1...

Page 2: ...itate to contact us at any time Content 1 General Information 3 1 1 Designation of the individual parts 3 1 2 Overview of required tools and auxiliary materials 3 1 3 Tightening torques for screws 4 2...

Page 3: ...ystems our specially developed mounting systems have significant time saving features that enable more efficient work when mounting the substructure and modules If you do not want to deal with the ins...

Page 4: ...photovoltaic modules may only be installed in accordance with the manufacturer s instructions 1 1 Designation of the individual parts A Ram profile C140 x 80 mm Length according to requirements B Raft...

Page 5: ...on are decisive for the length of the piles These are rammed into the ground by pile driving machines whereby optimum alignment in all directions is possible Step 1 Measuring of the ram points and mat...

Page 6: ...5 1 2 Step 2 Ramming works A...

Page 7: ...6 2 1 Step 3 Installation of rafter profiles A B E F B A G Torque 100 Nm A2 A4 130 Nm HV...

Page 8: ...7 1 2 Step 4 Installation of diagonal braces E F J B A E F G J B A G Torque 100 Nm A2 A4 130 Nm HV...

Page 9: ...8 1 2 3 Step 5 Installation of purlins G B E F C G B C Torque 60 Nm...

Page 10: ...9 1 2 Step 6 Installation of purlin connectors The number of connectors to be used depends on the table design Torque 60 Nm E F B C D G...

Page 11: ...10 Click in Click in 1 2 3 4 Step 7 Installation of modules C I Torque 8 10 Nm...

Page 12: ...11...

Page 13: ...12 Click in Click in Press Press 5 6 7 H...

Page 14: ...13 8 9 Torque 8 10 Nm Continue until the last module in the row is fixed At the end of the row a module end clamp is used again...

Page 15: ...hief In order to prevent this from happening we will be pleased to supply you with our safety balls or optionally shear nuts and or safety screws on request Depending on the measures selected theft is...

Page 16: ...client by means of appropriate expert opinions when the contract is awarded The company Oberhauser Bau Systeme GmbH certifies surface lifetime of 25 years within the scope of and in accordance with al...

Page 17: ...iod from the day of building approval but at the latest from the day of final invoicing 11 These conditions are a complete part of the contract concluded between Oberhauser Bau Systeme GmbH and the cu...

Page 18: ...the current state of the art Oberhauser is not liable for improper handling of the installed components With proper handling dimensioning according to the static conditions adherence to the maintenanc...

Page 19: ...18 Oberhauser Bau Systeme GmbH Rohrbach Bahnhof 18 84494 Niederbergkirchen Tel 49 0 8635 69392 0 Fax 49 0 8635 69392 20 E Mail info oberhauser pv de...

Reviews: