GATE SYSTEM INSTALLATION PROCEDURE
Printed:
10/23/2019
15-1507
OHI
OBERMEYER Hydro Inc.
17 of
36
Figure 10: As gate is lifted into place, multiple workers are helping guide the gate towards the correct position
3.
As gate is near the correct position, the hinge flap of the bladder will
need to be pulled up to make room for the gate to fit into it. When
the hinge is pulled up and the gate is properly positioned, the hinge
holes in the bladder will fit over the hinge studs located on the
bottom edge of the gate. There are two methods to pulling the hinge
flap up to make room.
a.
Use multiple workers to pry the hinge up by hand. The gate will
need to be slowly lowered and re-positioned as the hinge is pulled
up and over the gate all the way across the gate.
b.
Use a tie-wire to tie the hinge back to the main anchor bolts.
Position the gate and cut the tie-wires to allow the hinge to fall on
top of the gate.