background image

OBO Bettermann

20 | EN

Mounting the product

4 5 

Fastening the housing to a suspended vertical ladder

The housing is fastened to the vertical ladder with the back plate and lock 

plates.

 

 

Function loss!

 

The strain relief function can be restricted if the housing is not positioned 

centrally over the vertical ladder rung. 

During mounting on the vertical ladder rail, position the drill holes of the 

housing above and below the vertical ladder rung.

A

B

Fig  15:  

Connecting the back plate to lock plates

1.  Set the lock plates 

A

 on the rear plate 

B

.

2.  Place the washers on hexagonal bolts.
3.  Push the hexagonal bolts through the lock plates and back plate.

Fig  16:  

Fastening the back plate to vertical ladder rails with lock plates

CAUTION

Summary of Contents for 7125788

Page 1: ...OBO Bettermann Holding GmbH Co KG Mounting instructions Strain relief ZSE90...

Page 2: ...2020 OBO Bettermann Holding GmbH Co KG Strain relief ZSE90 Mounting instructions...

Page 3: ...5 Accessories 12 3 Approved installations and installation locations 12 3 1 General information 12 3 2 Approved installations 12 3 3 Fastening substrate 12 4 Mounting the product 13 4 1 Preparing cabl...

Page 4: ...these instructions Any images are intended merely as examples Mounting results may look different In these instructions cables and lines are referred to simply as cables To find out more about planni...

Page 5: ...re for the vertical routing of cables with vertical ladders on profile rails with clamp clips and with single clips designated as cable spacer clips in these instructions Maintenance of electrical fun...

Page 6: ...ny possible housing mounting The housing can be fastened at different points depending on the type of strain relief and type and scope of the cable installation Overview ZSE 90 strain relief Type Cabl...

Page 7: ...E90 strain relief EN 7 Product description strain relief ZSE90 Fig 2 ZSE90 ZSE90 L strain relief for cable installation on profile rail Fig 3 ZSE90 ZSE90 L strain relief for cable installation on vert...

Page 8: ...OBO Bettermann 8 EN Product description strain relief ZSE90 Fig 4 ZSE90 LH strain relief for cable installation on suspended vertical ladder...

Page 9: ...ling of the housing 2 Uncoated mineral fibre plate Filling of the housing 3 Housing Enclosure of the cable installation 4 Bolt ties Housing fastening 5 Connection sleeve Housing fastening 6 Threaded r...

Page 10: ...able installation 2 PYROSIT NG fire protection foam Filling and sealing of the housing 3 PYROPLUG Block FBA B200 14 foam block Filling of the housing 4 Connection sleeve Housing fastening 5 Bolt ties...

Page 11: ...tion foam Filling and sealing of the housing 3 Housing back plate Fastening of the housing to the vertical ladder 4 Housing lock plate Fastening of the housing to the vertical ladder 5 Connection slee...

Page 12: ...for cable systems with integrated maintenance of electrical function according to DIN 4102 Part 12 when standard support structures are used with vertical cable routing Cables with integrated maintena...

Page 13: ...he vertical ladder rail with back plate and lock plates Possible fastening points for the housing depending on the type of strain relief and type and scope of the cable installation Type Cable install...

Page 14: ...filler in the area of the strain relief Note The coating of the cables with fire protection filler is only necessary with the ZSE90 strain relief ASX Fig 9 Coating cables with fire protection filler 1...

Page 15: ...the profile rail or vertical ladder rung are not pre marked Slide nuts are positioned in those points where there is space However we recommend positioning the slide nuts as close to the outside as po...

Page 16: ...s or vertical ladder rungs Drill the drill holes in the wall in a line with cable spacer clips profile rails or vertical ladder rungs Fig 11 Fastening threaded rods on the wall 1 Apply the drilling sp...

Page 17: ...mount washers on the inner side and hexagonal nuts as spacers to the wall before fastening the housing Fig 12 Fastening the housing on threaded rods 6 Screw one nut and washer to threaded rods 7 Attac...

Page 18: ...vertical lad der rung when sufficient space is available The threaded rods are then locked with slide nuts Fig 13 Fastening threaded rods using slide nuts 1 Screw threaded rods in slide nuts 2 Screw n...

Page 19: ...ount washers on the inner side and hexagonal nuts as spacers to the wall before fastening the housing Fig 14 Fastening the housing on threaded rods 5 Attach the housing to the threaded rods and push i...

Page 20: ...t positioned centrally over the vertical ladder rung During mounting on the vertical ladder rail position the drill holes of the housing above and below the vertical ladder rung A B Fig 15 Connecting...

Page 21: ...on the threaded rods 8 Attach the housing to the threaded rods and push it against the back plate Risk of breakage on the housing The housing may break due to excessive pressure of the fastening mate...

Page 22: ...ottom side before coating The housings of the types listed above must be filled with the supplied pre coated and uncoated mineral fibre plates Residual joints must be filled with ASX fire protection f...

Page 23: ...Seal the residual gaps and wall connections with ASX fire protection filler 8 Completely seal the top and bottom sides of the filling with ASX fire protection filler to a thickness of 1 mm If necessa...

Page 24: ...locks and PYROSIT NG fire protection foam Spac es with low or no assignment are filled with foam blocks Residual joints between the foam blocks must be filled with FSB SP fire protection filler The re...

Page 25: ...PYROSIT NG PYROSIT NG PYROSIT NG FBA SP Fig 23 Applying fire protection foam 2 Fill residual cavities with fire protection foams 3 Seal residual joints between the foam blocks with fire protection fi...

Page 26: ...t Variant B Filling with fire protection foam PYROSIT NG PYROSIT NG PYROSIT NG Fig 25 Filling the housing with fire protection foam 1 Fill the housing with fire protection foam Fig 26 Fully mounted st...

Page 27: ...n plate with permanent marker 2 Mount the identification plate on the wall next to the strain relief Mounting with suspended strain relief on the housing 1 Clearly fill out the identification plate wi...

Page 28: ...ounting Residual material also with coating As household waste Packaging As household waste Disposal during building demolition As rubble Disposal after a fire CAUTION Caution Irritant effect If there...

Page 29: ...740 220 650 175 7215730 The scope of delivery comprises the housing filling material mineral fibre plates ASX ablation coating identification plate and fastening material ZSE90 L Strain relief intern...

Page 30: ...elivery comprises the housing with back plate and 2 lock plates identification plate and fastening material 6 2 Accessories Article Type Article number Packaging unit Ablation coating ASX 7203210 1 PY...

Page 31: ...Mounting instructions ZSE90 strain relief EN 31 Own notes...

Page 32: ...BORD 190626 11 2020 OBO Bettermann Holding GmbH Co KG P O Box 1120 58694 Menden GERMANY Customer Service Germany Tel 49 0 2373 89 1700 Fax 49 0 2373 89 1238 E mail export obo de www obo bettermann com...

Reviews: