26
Laying the screed
Close the hinged cover and attach the steel
plate and mounting cover .
Note:
We recommend routing the screed with-
out an additional separation layer . A separation
layer can be used to reduce noise transmission,
although this reduces fixed anchoring of the ser-
vice unit in the screed .
Lay the screen flush to the top edge of the
mounting cover and work it up to the service
unit .
Performing the electrical installation
Remove the mounting cover and steel plate
and dispose of them . Open the hinged lid .
Insert strain reliefs in front of the installation
pipe .
Insert the connection cable for the sockets
and strip it by approx . 150–200 mm .
Fix the connection cable by pushing the
strain relief together .
Summary of Contents for GE 2V 15 B
Page 2: ......
Page 3: ...3 DE Montageanleitung 15 EN Mounting instructions 23...
Page 4: ...4 1 2 5 m m 125 mm 85 mm 20 mm 1 2 4 3 5 6 8 7 1 1 2 3 4 5 2...
Page 5: ...5 3 1 2 4...
Page 6: ...6 6 5...
Page 7: ...7 8 20 mm 25 mm 7...
Page 8: ...8 10 max 5 mm 9...
Page 9: ...9 12 11...
Page 10: ...10 150 200 mm 14 7408 650 13...
Page 11: ...11 90 1 2 3 16 11 mm L N 15...
Page 12: ...12 1 5 mm 17 18...
Page 13: ...13 19 20...
Page 14: ...14 21 22...
Page 22: ......
Page 30: ......
Page 31: ......