System instructions OBO isCon
®
EN | 43
Installing the isCon system
5 4
Fastening the interception rod in the interception rod
stand
5 4 1
Mounting the concrete plinth
1
2
3
4
5
Figure 45:
Concrete plinth with fastenings
Legend:
1
Hexagonal nuts (with washers) for height compensation
2
Lock nut (with washer and plate)
3
Concrete plinth
4
Edge protection
5
Threaded rod
• From below, push the threaded rod through the opening of the edge
protection and the concrete plinth and fix it with the lock nut.
5 4 2
Erecting the interception rod stand
See also „3.3 Insulated interception rods“ on page 11
CAUTION
Risk of crushing when erecting the interception rod stand!
When erecting the interception rod stand, hands and other limbs may be
crushed by moving parts.
When erecting the interception rod stand, do not reach between moving
parts!
Note!
To determine how many concrete plinths must be used in the isFang inter-
ception rod system, use Tab. 10 on page 28 or ask your planning office
to carry out the static calculations.
Summary of Contents for isCon 750 LGR
Page 1: ...03 2014 EN isCon System instructions...
Page 65: ...System instructions OBO isCon EN 65 Own notes...
Page 66: ...OBO BETTERMANN 66 EN...
Page 67: ......