OBO Bettermann
32 | EN
Installing the isCon® system
Assembling the air-termination rod
5 2 1
Air-termination rod with internal isCon
®
conductor
1
2
3
4
5
6
7
8
Figure 26:
Air-termination rod with internally routed isCon
®
conductor
Legend:
1
Air-termination rod
2
Internal connection element
3
Isolated central rod
4
Potential connection with potential connection element
5
Retaining mast with side exit
6
Air-termination rod stand with side exit
7
Concrete plinth with edge protection
8
Internally routed isCon
®
conductor with connection element