Version 5.2_2022 (January 26, 2022)
19
7.10.4.
Defrosting cycle active:
Light active when defrosting cycle is active. Also readable from the display of the Carel controller (countdown
timer).
8.
Set-up and installation
! CAUTION:
This chapter contains important instructions on how to safely install your
Aqua
Cool!
8.1.
Preparations
The following preparations are important for setting up the Aqua Cool:
- The unit is designed for both indoor and outdoor installation.
- The Aqua Cool should be placed on a stable surface.
- The set-up must be designed in such a way that there is sufficient space around the unit for
inspection and service work. The need to work safely must be borne in mind. This requires a
clearance of at least 1 metre on the inspection side. Moreover, free space is necessary for
unimpeded air supply and extraction. Attention must be paid to prevent an air short circuit between
the air injection and intake. The intake of fresh outside air must be taken into account (no exhaust
fans or other exhaust openings in the immediate vicinity of the air intake opening).
- The foundation must be such that the unit can be set up level, with the load sufficiently supported,
and vibration transmission minimised.
Safety!
- Before the Aqua Cool can be put into operation, all inlet and outlet openings must be fitted with ducts
or grilles. All inspection doors / hatches must be closed. This is to prevent physical injury.
! CAUTION:
To ensure that the unit functions properly, it must be set up completely level (height should
be compensated with shims under the unit or vibration dampers).
If you have any questions or doubts about the set-up options, please contact OC Verhulst.
Information on dimensions and weights is given in the technical data mentioned above and on the scale
drawing of your unit.
8.2.
Delivery and transport
We advise you to check your Aqua Cool immediately upon delivery by OC Verhulst for transport damage.
Report any transport damage immediately to the carrier and within 24 hours to OC Verhulst. If transport
damage is not reported immediately, all warranty claims become null and void.
Also check that the delivery is complete (see the packing list) and that the necessary documentation is
present (in the control compartment).
8.2.1.
Vertical transport
When transporting to the installation site, please ensure that the transport and lifting instructions shown in
the drawings below are followed. The unit must be moved using appropriate lifting gear.
When lifting the air handling unit, the lifting eyes at the top of the unit must be used. The hoisting strap must
be attached to the crane hook with a bow shackle (4 pcs M16). Please note the stated weight!