40
Chapter 4 Standard Tasks
Lift the Océ BLM500 Main Deck
Lift the Océ BLM500 Main Deck
Introduction
[16]
[16] Lift the Océ BLM500 Main Deck
[19]
When to do
If a machine error occurs, or for maintenance.
■
To access the stitch head
■
To access the former area
■
To access the trim area
Procedure
[20]
A
B
C
A
Folder Cover open
B
Connecting Bridge Cover open
C
Clincher Frame lifted
Step
Action
Information
1
Open the connecting bridge
cover.
see ‘Open the Connecting Bridge Cover’
2
Open the folder cover.
see ‘Open the Connecting Bridge Cover’
3
Lift the clincher frame.
see ‘Lift the Clincher Frame’ on page 38
4
Open the gathering area
cover.
see ‘Lower the Clincher Frame’ on
5
Lift the Océ BLM500 main
deck.
The main deck lifts to approximately 60.
Summary of Contents for BLM 500
Page 1: ...Oc BLM500 Oc User manual Bookletmaker Oc BLM500...
Page 5: ...5 Chapter 1 Introduction to the Oc BLM500...
Page 20: ...20 Chapter 2 How to run the Oc BLM500 Run the Job...
Page 21: ...21 Chapter 3 The User Interface...
Page 46: ...46 Chapter 4 Standard Tasks Operate the Oc BLM500 offline...
Page 76: ...76 Chapter 5 Error Conditions Problems and Solutions Manually park the Shuttle...
Page 77: ...77 Chapter 6 Maintenance...
Page 95: ...95 Appendix A Specifications...
Page 98: ...98 Appendix A Specifications Specifications...
Page 99: ...99 Appendix B Declaration of Conformity...
Page 101: ...101 Appendix C Miscellaneous...