TWO PIECES FREESTANDING BATH INSTALLATION:
1.
Place bath in its final position and adjust
leveling legs to make it leveled in both
directions. Draw a reference line on the floor
(around the skirt).
2.
Flip the bath, remove the screws that hold the skirt to
the bathtub and remove the skirt.
3.
Install faucet, drain and overflow. Use flexible
hoses for hot and cold water supply. Make sure
the overflow is narrow enough to fit between the
bath and the skirt.
Connect bath drain into the floor drain without
any glue to make sure the installation is
appropriate. Draw a mark around each of the 4
legs.
4.
Flip the bath upside down on blocks and re-install the
skirt with the screws removed in step 2.
5.
Flip the bath/skirt assembly on the blocks.
Make required connections (hot/cold water,
chromatherapy light, keypad, water detector,
blower). For certain models, the blower should
be installed somewhere else than under the
skirt to allow an easy access to it.
Test water supply connections and test drain to
make sure there is no leakage. After testing,
use a small container to collect water under the
bath.
6.
Apply a fair amount of silicone on the floor, onto the 4
spots marked in step 3 (4 legs).
7.
Remove the blocks and put down the bath in its final
position while connecting the drain.
Note :
To lift the bath in the future, remove the drain and
overflow from inside the bath and lift the bath/skirt
assembly.