7.2.  Steam Generator Location

The steam generator should be installed in dry well ventilated place in close proximity to the steam room. It 

can be placed on the floor or hung on wall. 

To hang the generator on a wall drill 3 holes 8mm in diameter in accordance with the table below. Fix the top 

2 screws in place first then hang the generator by the 2 keyhole shaped holes in the back plate. Then with the 

front cover removed fix the 3rd screw to secure the unit in place.

<10m

The steam generator can be installed anywhere that is dry and has an airflow. 

Example locations:

•  Plant Room

•  Cupboard in an adjacent room

•  In the loft

•  Up to 1.5m beneath the unit in a basement

Important notes:

•  The steam pipe should be insulated and not travel further than 10 metres

•  Do not reduce size of steam pipe at any point

•  the steam pipe must not go down and then up, as this will create a trap and damage the 

steam generator.

465mm

Summary of Contents for OCD-120

Page 1: ...PRODUCT IMAGE Oceanic Ltd Pountney Street Wolverhampton WV2 4HX Phone 01902 450 550 sales oceanic saunas co uk www oceanic saunas co uk Sauna Steam Heavy Duty Commercial STEAM GENERATOR 15 06 17...

Page 2: ...e 2 OC D Controller Parameters 8 5 7 Temperature Sensor Parameters 8 6 OC A Controller Description 9 7 Installation 10 7 1 Generator Size 10 7 2 Steam Generator Location 11 7 3 Water and Steam Connect...

Page 3: ...as well as displaying the steam generator s status by the 8 LED s on the panel heating water inlet temperature drain status etc note also that one OC D controller can control multiple Oceanic steam g...

Page 4: ...Sauna Steam Oceanic Saunas 01902 450 550 sales oceanic saunas co uk 4 Steam Generator Manual 4 Steam Generator Parts 4 3 2 1 9 8 7 6 5 10 15 11 11 12 13 14 17 18 19 20 16...

Page 5: ...ction 9 Relay Circuit Board Electrically operated switches for elements 10 Overheat switch Boil dry protector operates at 105oC Use Pin to reset 11 Louvers Ventilation 12 Main Power Cable Entry Cable...

Page 6: ...box has to be carried out by an authorised electrician In case of a warranty claim you are kindly requested to present a copy of the invoice from the electrician Model Power Current amps Size mm Stea...

Page 7: ...e relief valve Operates if the pressure in the boiler exceeds 1 2kg c m2 Supplied 10 Brass T junction 3 4 to 3 4 and 1 2 brass fitting to fit steam pipe and pressure relief valve Supplied 11 Brass T 3...

Page 8: ...Sauna Steam Oceanic Saunas 01902 450 550 sales oceanic saunas co uk 8 Steam Generator Manual 1 1 2 2 5 5 6 6 7 8 13 14 16 15 17 18 19 20 20 3 3 4 Jubilee clip cable tie Jubilee clip cable tie...

Page 9: ...pipe Use a 3 4 female cap to block off the secondary outlet 9 9 10 13 13 13 10 12 11 5 2 Steam Pipe Connection Options Important note Steam outlet must not be reduced Mains in 230V 1N 400V 3N 230V li...

Page 10: ...AVE J7 R CONTROL D9 J6 TEMP2 D8 D7 D6 D5 D4 D3 D2 D1 J4 NO NC Water Inlet AC power adapter AC230V DC24V Water Inlet Valve Drain Valve Descale Liquid Inlet Pump OC S Controller 2 r Circuit Diagram 2 4...

Page 11: ...OCD 90 535 260 380 25 135 45 OCD 120 535 260 380 25 135 45 6 Parameters 6 2 Clearance distances 200mm 300mm 400mm 500mm A B C E D F 6 1 Steam Generator Frame Sizes 6 3 Ventilation Ensure air flow into...

Page 12: ...D 30 60 o C 155 x 115 x 20 MODEL Detected Scope Max Cut out Temperature Size mm o C o F o C o F L W H OC S 0 110 32 230 60 248 76 42 27 6 4 Table 2 OC D Controller Parameters 6 5 Temperature Sensor P...

Page 13: ...adequate guarding post a notice to caution users Keep the number of right angle bends to a minimum and ensure that the run does not create a trap into which condensate would gather and cause a blocka...

Page 14: ...ace first then hang the generator by the 2 keyhole shaped holes in the back plate Then with the front cover removed fix the 3rd screw to secure the unit in place 10m The steam generator can be install...

Page 15: ...ler and temperature probe OC D controller is waterproof and can be installed inside or outside the steam room according to customer preference i For a better connection and to eliminate any future con...

Page 16: ...e main circuit board but you can add your own fused spur for extra protection if you prefer 7 7 Installing a Fan Same as above for a light 7 8 Connecting to descaler i OCD Generator is able to run aut...

Page 17: ...o Water Supply 10 Generator Has Overheated 11 Fan On 12 Light On 13 Keypad Locked 14 Auto Timer Set 15 Fan On Decrease 16 Setting 17 Drain Must Be Off Increase 18 Light On Left Scroll 19 Machine On Of...

Page 18: ...uttons to set the hours minutes and day 9 4 Setting Temperature i You can set the temperature between 35 and 600 C and between 95 and 1400 F ii If you are a novice user we advise to start at around 38...

Page 19: ...am specfiic times for the generator to turn on and off throughout the day Once setup machine will remember to turn on or off at these same times everyday vi You can choose in the morning from between...

Page 20: ...d it You must remember though that once the cycle has been completed you must turn the Tick to a X to turn the weekly descale off To setup descaling push Push to enter iv The default is Sunday between...

Page 21: ...ng out of steam nozzle Water Level Probe Remove and clean water level probe Check connections to and from water level probe Check water pressure is 1bar Circuit breaker tripping out Element failure Lo...

Page 22: ...the water for hardness and arrange the descaling routine accordingly High levels of hardness descale once every 50 to 100 hours of operation Medium levels of hardness descale once every 100 to 250 hou...