15
4.1 Installing the Light Fixture - Allure 150 & 250 XFM HD Gen2 MK2.2
Additional tools needed that are not provided by OceanLED
• Marine sealant - 3M 4200 or equivalent
• Cable ties
• Waterproof Cable Connectors / Junction Box (optional)
• Allen key (4mm)
• Thread lock - Loctite 243 or equivalent
Tip
: OceanLED recommends dry fitting all products. When installing, be sure that the light fits the area and
secures to the hull using the appropriate hardware before applying any sealant.
Tip
: When applying sealant to light fixture, use the OceanLED packaging material as a cushion when placing
light on the ground face down to prevent lens damage.
Installation (Once hull preparation is complete)
1.
(If using Delrin sleeve) insert the Delrin sleeve into the drilled hole and apply marine sealant to seal
between the Delrin sleeve and the hull
2.
Remove locking cap from the mounting tube, the light cartridge must be left in place.
3.
Apply sealant to rear of mounting tube assembly’s bezel to ensure a complete unbroken seal
around the light.
Tip
: Make sure sealant fills in the recess groove on the reverse of the light bezel:
OceanLED INSTALL / ALLURE / 240717 / 7.1