23
ODB COMPANY
800-446-9823
SKB700
Pre-Operating Section
2.4 Pre-Transport Checks (continued):
7. Check the general condition of the tires, tire pressure and ensure that
all lugnuts are securely fastened.
8. Visual examination of the leaf vacuum frame, suspension and structure
to determine if all components are correctly positioned and secured for
travel.
9. Check the intake hose boom to verify that it is securely fastened to the
leaf vacuum and can not swing free. (if equipped).
10. Verify there are no loose tools or materials on the trailer, inside the
intake and exhaust hoses, or inside the engine sheet metal.
11. Check all cones, wheel-chocks, signs or other support tools and mate-
rials to ensure proper stowage.
Summary of Contents for SKB700
Page 35: ...35 ODB COMPANY 800 446 9823 SKB700 Operating Section...
Page 36: ...36 ODB COMPANY 800 446 9823 SKB700 Operating Section...
Page 37: ...37 ODB COMPANY 800 446 9823 SKB700 Operating Section...
Page 138: ...138 ODB COMPANY 800 446 9823 SKB700 INDEX Volt Meter 76 W Water Temperature Sender 82...