8
4.
Start-up / Shut-down
Before Start-up:
Read and observe operation manual.
In order to guarantee proper function and trouble-free operation,
the following checks to be carried out before start-up:
•
General condition of the unit (connections, gaskets, etc.).
•
Power
cables/connections.
•
High pressure hoses, hose lines, whether damaged.
•
Air supply, fresh air grill must not be covered.
•
Filling of consumables.
•
Correct oil level of high pressure pump (sight glass/dip stick).
High pressure pump: OERTZEN OSHP special pump oil.
•
Pump/pump connections whether leaking.
•
Machine only to be run with absolutely clean water. Before connecting
the water supply hose, rinse it thoroughly. Depending on feed water
quality, regularly check water filter in short intervals, replace if needed.
•
Machine only to be run horizontally (+/- 5°).
In order to guarantee proper function and trouble-free operation,
the following checks to be carried out during working:
•
Observe function of indicator lights/monitors.
•
Observe pressure variations
•
Observe leaks at high pressure pump, hose pipes, connections.
•
Observe unnormal noise.
In case of malfunctions immediately stop machine, eleminate cause according
to chapter „Trouble Shooting“, call qualified service.