Allgemeine Informationen
Offgridtec GmbH
Landshuter Str. 141 – 143
84307 Eggenfelden
WEEE-Reg.-Nr. DE37551136
Kontaktinformation
Tel: 08721-7786187
Email: info@offgridtec.com
Web: www.offgridtec.com
GFR: Christian & Martin Krannich
Konto Sparkasse Rottal-Inn
Konto: 10188985
BLZ: 74351430
IBAN: DE69743514300010188985
BIC: BYLADEM1EGF (Eggenfelden)
Sitz und Amtsgericht
HRB: 9179 Registergericht Landshut
Steuernummer: 141/134/30045
Ust-IdNr: DE287111500
Gerichtsstand: Mühldorf am Inn
Offgridtec MPPT Pro Duo
Seite
12
von
19
Step5: Connect the remote meter MT11 and AES signal of the refrigerator
❶
RS485 Communication cable
Models
:
CC-RS485-RS485-3.81-4P-150(Included)
CC-RS485-RS485-3.81-4P-1000(Optional)
CC-RS485-RS485-3.81-4P-2000(Optional)
The operation of the remote meter refer to the user
manual of MT11
The controller only provides one AES signal control, and
the practical consideration is needed for the specific
application (Check the “1.5 AES Signal output port
instruction” for more information).
Step6: Power on the controller
The first step, close the BATT2 safety switch and check the BATT2 charging indicator status. The second step, close the
BATT1 safety switch and check the BATT1 charging indicator status (Check the “3. Display Units” for more information).
The last step, close the PV array circuit breaker.
CAUTION: If the controller is not operating properly or the battery indicator on the controller shows an abnormality,
please refer to 5.2 “Troubleshooting.“