background image

This section completes the greenhouse frame by joining the 4 walls and completing the roof. At this

stage it is best if two people work together.

Collect all the parts needed for the roof and keep on the side until necessary.

PART 4 – FULL STRUCTURE AND ROOF

A S S E M B L I N G  T H E   G R E E N H O U S E

Part#

Part Name

Part Image

Qty.

11
35
47
48
43
52

Roof Support Pole
Top Roof Bar
Beam End Cap
Gutter End Cap
Bolt
Nut

6
1
8
4
30
30

PAGE 15

11

11

11

11

11

15

11

STEP

 

4

STEP

 

5

STEP

 

1

STEP

 

3

STEP

 

2

Summary of Contents for OG03AL86-BKE

Page 1: ...OGrow Walk in 6 x 8 LAWN AND GARDEN GREENHOUSE With Heavy Duty Aluminium Frame MODELS MANUAL VERSION 2 OG03AL86 BKE OGAL 866...

Page 2: ...safety instructions in this manual If you have any questions please contact our Customer Service Department Let s Grow Together Parts List Side Walls Back Wall Front Wall Door Frame Roof and Full Stru...

Page 3: ...pport Pole Top Doorway Beam Corner Bracket Door Rail Vent Support Bar Rear Floor Bar 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 PART PART NAME PART IMAGE QTY 1 2 1 1 1 1 6 2 1 2 1 2 1 2 1 2 Front Fl...

Page 4: ...Roof Bar Side Ceiling Plate Bolt Door Screw Vent Screw Panel Clip Beam End Cap Gutter End Cap Long Door Support Bolt 45 47 48 49 50 51 52 A I PART PART NAME PART IMAGE 1 2 1 98 1 1 1 23 Door Frame Sp...

Page 5: ...en tired or when under the influence of alcohol drugs or medication 8 Build the Greenhouse on a flat and level surface A concrete foundation is recommended for a high quality installation 9 WARNING Th...

Page 6: ...ou are to use consult a professional It is always your responsibility to ensure that the greenhouse is properly anchored Ogrow cannot be held responsible for personal injury damage to the greenhouse o...

Page 7: ...sly If this is your first time building a greenhouse it may take a good chunk of a day to complete the construction properly Prepare the tools you will need A Drill A Screwdriver A Spanner Part 47 Lay...

Page 8: ...side wall following the layout shown below The grooves in the PART 1 SIDE WALLS A S S E M B L I N G T H E G R E E N H O U S E Part Part Name Part Image Qty 10 22 31 33 34 49 Side Support Pole Diagonal...

Page 9: ...the Side Walls NOTE Each step applies to all relevant wall supports Repeat the above steps to make the second side wall 43 52 43 52 34 49 34 49 10 34 34 49 49 31 31 10 22 33 PAGE 9 Bolt the top of th...

Page 10: ...G R E E N H O U S E 16 9 8 21 05 04 22 1 1 22 13 13 Part Part Name Part Image Qty 1 4 5 8 9 13 21 22 34 49 Corner Beam Rear Right Roof Beam Rear Left Roof Beam Rear Support Pole Left Rear Support Pole...

Page 11: ...pport pole Then bolt the top of the support poles to the outside of the roof beams using another bolt STEP 4 On the inside of each corner bracket attach the diagonal supports to the lowest bolt and th...

Page 12: ...oor Rail Front Floor Bar Vertical Door Rail Support Front Horizontal Support Front Diagonal Support Long Door Support Bolt Door Frame Spacer Bolt Nut 29 06 23 01 02 07 23 29 01 12 03 17 14 19 PAGE 12...

Page 13: ...side of each corner brac attach the diagonal supports to t lowest bolt and the horizontal sup to the second to lowest bolt Ope bolts position the supports and refasten the bolts STEP 5 Bolt the two sh...

Page 14: ...ttach the vertical door rail support to the end of the door rail that is jutting out of the structure STEP 3 Secure the bottom of the vertical door rail support to the outside of the roof beam using t...

Page 15: ...lect all the parts needed for the roof and keep on the side until necessary PART 4 FULL STRUCTURE AND ROOF A S S E M B L I N G T H E G R E E N H O U S E Part Part Name Part Image Qty 11 35 47 48 43 52...

Page 16: ...tach the roof support poles to the outside of the top roof bar and the gutter bars Slide an extra bolt into each pole before securing Lift the greenhouse structure onto the prepared base and secure lo...

Page 17: ...ART 5 THE DOOR A S S E M B L I N G T H E G R E E N H O U S E 20 28 24 26 26 27 Part 20 24 26 27 28 31 44 49 50 43 52 Left Door Support Top Door Bar Center Door Bar Bottom Door Bar Right Door Support D...

Page 18: ...seals are in place in the two door side support bars and trim any rubber that sticks out Lift the door into an upright position and ease the bottom bar onto the door track on the front floor bar STEP...

Page 19: ...bar should be laid using the images for guidance PART 6 THE VENTS A S S E M B L I N G T H E G R E E N H O U S E Part Part Name Part Image Qty 15 18 30 32 33 A I 45 51 43 52 Vent Support Bar Vent Stopp...

Page 20: ...vent is square by measuring that the diagonals are the same and then tighten the bolts in each corner Slide the completed vent into the top roof bar to the space between the two roof support poles Tur...

Page 21: ...with panel clips placing a clip wherever there is a marking on the diagrams above Using two fingers apply pressure to the two rounded points of the clip positioning them under the polycarbonate panel...

Page 22: ...uring each panel with clips before continuing to the next panel Next insert the back and front panels and lastly insert the panels of the door Slide the panels into the lowest groove of the top roof b...

Reviews: