STEP
34
43 52
17
1
47
48
36
43 52
Attach the gutter end and beam
end plastic caps to the ends of
the appropriate poles, covering
the exposed edges for your
protection.
STEP
1
Lift the walls and bolt the side
floor bars to the inside of the
corner beams at each corner.
STEP
2
STEP
3
Bolt the top roof bar to the
underside of the roof beams,
securing with two bolts - one
through each of the roof beams.
Repeat at the other end of the roof.
4
Attach the roof support poles to the
outside of the top roof bar and the
gutter bars. Slide an extra bolt into
each pole before securing.
Lift the greenhouse structure onto
the prepared base and secure
loosely. Check the frame is square
by measuring the diagonals to be
equal. Tighten all nuts after making
sure the greenhouse is sitting
securely on the base.
STEP
6
Follow the steps below to assemble Full Structure and Roof.
STEP
1
36
4
1
25
23
2
35
3
36
11
10
43 52
43 52
PAGE 16
STEP
5
Attach the ends of the gutter bars
to the inside of the corner sections
on the adjoining walls. The four
walls are now connected in a
rectangular formation.