background image

Step 1:

This procedure will assist you with assembling the 

OGrow Walk-In 4 ft. by 6 ft. Lawn and Garden 

Greenhouse with Heavy Duty Aluminum Frame.

Step 2:

To complete this procedure, you will need a Hammer, 

a Phillips Screwdriver, a Drill, fifteen-sixty fourths 

inch Drill Bit, and Gloves. Optionally, you may need a 

Step Ladder, a Caulking Gun, and Silicone Glass Glue.

Note: Make sure the Greenhouse is located on a flat, 

level surface.

Step 3:

Position (K - 0 3 B), (K - A 0 2), and (K - 0 4) at right 

angles to each other. Make sure the grooves are on the 

outside.

Note: Make sure the assembly is at the location you 

want the Greenhouse to be installed.

Summary of Contents for OGAL-46

Page 1: ......

Page 2: ...Screwdriver a Drill fifteen sixty fourths inch Drill Bit and Gloves Optionally you may need a Step Ladder a Caulking Gun and Silicone Glass Glue Note Make sure the Greenhouse is located on a flat lev...

Page 3: ...at each corner Secure with 2 Nuts K A 3 1 Do not fully tighten the Nuts Step 5 Slide K 0 5 into position Repeat for both corners Tighten the Nuts Step 6 Insert 2 Bolts and 2 Nuts into K A 0 2 in the i...

Page 4: ...t en all the Nuts Step 8 Insert 1 Bolt into each K 0 5 and K A 0 3 Frame Attach K A 1 5 to the Bolts using 4 Nuts Make sure all the Nuts are tightened Step 9 The UV protected side of the sheet is cove...

Page 5: ...Step 10 Remove the Opal White Film from 3 K A 2 4 Panels Step 11 Slide 3 K A 2 4 Panels into the grooves of each Beam Step 12 Insert 4 Bolts and 4 Nuts into each hole of K A 0 6...

Page 6: ...y tighten all of the Nuts Step 14 Insert 4 Bolts and 4 Nuts into K 0 3 B and K 0 4 in the indicated areas Do not fully tighten the Nuts Step 15 Insert K 2 0 and K 0 9 onto the Bolts in K 0 4 Fully tig...

Page 7: ...and K 1 0 onto the Bolts in K 0 3 B Fully tighten the Nuts Note Support these Beams until they have additional supports Step 17 Insert 3 Bolts each into K 1 9 K 2 0 K 1 0 and K 0 9 Step 18 Insert 2 B...

Page 8: ...tep 19 Remove the Opal White Film from K A 2 1 K A 2 0 and K A 2 2 Panels Step 20 Insert K A 2 2 K A 2 0 and K A 2 1 Panels into the grooves of the Beams Step 21 Slide 1 Bolt each into K 0 6 and K 0 7...

Page 9: ...Nuts Step 23 Insert 2 Bolts each into K 0 6 and K 0 7 Step 24 Align 2 Bolts on K 0 5 and 2 Bolts on K 0 6 to the holes in K 2 1 Attach K 2 1 using 3 Nuts Repeat on the other side Note Another piece wi...

Page 10: ...0 7 Step 26 Align 2 Bolts on K 1 0 and 2 Bolts on K 0 6 to the holes in K 2 1 Attach K 2 1 using 4 Nuts Align 2 Bolts on K 0 9 and 2 Bolts on K 0 7 to the holes in K 2 1 Attach K 2 1 using 4 Nuts Step...

Page 11: ...Bolts on K 0 7 to the holes in K 2 3 Attach K 2 3 using 4 Nuts Step 29 Insert 1 Bolt each into the underside of K 0 6 and K 0 7 this Bolt will be used in a later step Step 30 Insert 2 Bolts into the e...

Page 12: ...he angle be tween K 1 9 and K 0 6 Attach the wedged end of K 1 2 to K 1 0 using 1 Bolt and 1 Nut Rotate K 1 2 into position being sure to align the last Bolt on K 1 9 and securing it with 1 Nut Tighte...

Page 13: ...the Greenhouse Assembly in desired location against a Wall Mark the locations of the holes in the side of the Assembly which will be in contact with the Wall Step 36 Move the Assembly away from the W...

Page 14: ...y to the wall using 10 Screws K A 1 9 Note Be careful when moving the Assembly base It may detach from the base if not tightened sufficiently Step 37 Drill 10 holes corresponding with the marks on the...

Page 15: ...tep 41 Attach K A 0 4 onto the Greenhouse Insert the Bolts on each end of K A 0 4 with the middle holes in K A 0 6 and K A 0 7 Secure with 4 Nuts Step 42 Remove the Opal White Film from 2 K A 2 5 Pane...

Page 16: ...43 Slide 2 K A 2 5 and 1 K A 2 7 Panels into the grooves of the Roof Frame Assembly Step 44 Slide K A 0 5 into K A 0 6 to hold the Roof Pan els in place Step 45 Attach K 0 8 to K 0 6 using 1 Bolt and...

Page 17: ...Step 47 Insert 3 Bolts into K 1 3 Step 46 Attach G P 3 L to K 1 3 using 1 Nut and 1 Bolt Step 48 Attach the Bolts on K 1 3 to K 0 8 and K 1 2 using 3 Nuts...

Page 18: ...1 1 between both K A 0 4 Beams sliding the notches over the 2 Bolts Attach K A 1 2 to those Bolts and the 2 Bolts on K 0 6 and K 0 7 Step 51 Attach 2 K A 0 9 to K A 0 8 using 2 Nuts and 2 Bolts Note T...

Page 19: ...2 Secure the front corners of the Frame with 4 Bolts and 4 Nuts Step 54 Slide K A 2 6 Panel over the lip of K A 1 0 and into the grooves of the Window Frame Assembly Note The smooth parts of the Frame...

Page 20: ...Assembly into the groove of K A 0 7 Make sure the Window Assembly pivots up and down correctly Step 55 Attach K A 1 3 to K A 1 0 using 2 Screws K A 3 2 Step 57 Remove the Opal White Film from 1 K A 2...

Page 21: ...Step 59 Slide 1 K A 2 9 Panel into the middle slot Step 58 Attach 2 K 1 5 Beams to 1 F 1 6 B Secure with 4 Screws K A 3 1 A Step 60 Attach 1 F 1 6 B to 2 K 15 Frames Secure with 4 Screws K A 3 1 A...

Page 22: ...Step 62 Cap the top and bottom of the Door with 2 F 1 4 B Step 61 Slide 2 K A 2 8 Panels into the ends of the Door Step 63 Secure the F 1 4 B Beams using 4 Screws K A 3 1 A...

Page 23: ...3 2 Repeat on the other side Step 64 Insert 1 F 2 2 B into the bottom of F 1 6 B Secure F 2 2 B with 1 Screw K A 3 2 Repeat on the other side Step 66 Slide the assembled Door into position Ensure tha...

Page 24: ...Step 68 Attach G P 3 R to K 1 3 using 1 Nut and 1 Bolt Step 67 Secure the Door with 2 Bolts and 2 Nuts attached to K 0 3 B Step 69 Insert the rectangular ends of 2 G P 1 into the ends of K A 0 5...

Page 25: ...y Aluminum Frame Step 70 While not required it is recommended to use Glue or Tape between the Polycarbonate Panel and the Alumi num Frame to enhance the stability Note Silicone Sealant and Glue Gun ar...

Reviews: