CHAPTER 4 TESTING
4.5.3 Full Load Test
1. After the Off Center Load Test has been passed, test the Base’s full capacity
according to the Specification Tables 1-1 through 1-6. The Base must meet all
specifications as listed.
2. If the Base fails the Full Load Test, check and set the Overload Stops.
(See Section 3.3.)
Ohaus Corporation www.ohaus.com
4-6
Defender™ H-Q-W Series Service Manual
Summary of Contents for Defender D15HR
Page 2: ......
Page 4: ......
Page 34: ...APPENDIX A GLOSSARY Ohaus Corporation www ohaus com A 2 Defender H Q W Series Service Manual...
Page 35: ......
Page 36: ...80252596 P N 80252596 SERVICE MANUAL DEFENDER H Q W SERIES BASES...