4-11
CHAPTER 4 REPAIR PROCEDURES
4.5
REPLACING THE LOAD CELL COMPONENT
This procedure is used when it is desired to keep the existing Load Cell Frame and replace only the Load
Cell. The Load Cell Assembly is centrally located inside the scale. When the new Load Cell is mounted
to the existing Frame, the Overload Protection Stops must be adjusted.
1. Refer to Section 4.1 and remove Top Housing.
2. Refer to Section 4.4 and perform steps 1 through 4. The Load Cell and Frame can now be removed.
Make sure the Load Cell Cable in the Bottom Housing can be removed by cutting the tie wrap holding
the battery wires together with the Load Cell cable.
3. Remove the Load Cell, by unscrewing two bolts on the top of the Load Cell and two bolts on the
bottom of the Load Cell. See Figure 4-16.
Figure 4-16. Load Cell Mounting Bolt Locations.
MOUNTING BOLTS
MOUNTING BOLTS
TOP OF LOAD CELL
BOTTOM OF LOAD CELL
4. Place the replacement Load Cell on the Bottom Load Cell Frame into position and install the two
bolts previously removed.
DO NOT TIGHTEN.
5. Postion the Top load Cell Frame on top of the Load Cell and install the two bolts previously
removed.
DO NOT TIGHTEN.
TABLE 4-1. LOAD CELL SCREW TORQUE INFORMATION.
CAPACITY
TORQUE
3 kg
7 N.m / 62 in. lb
6 kg
10 N.m / 88 in. lb
15 kg
10 N.m / 88 in. lb
30kg
10 N.m / 88 in. lb
6. Align Top and Bottom Frames and tighten screws as indicated. Recheck alignment.
Summary of Contents for EC Series
Page 2: ......
Page 4: ......
Page 14: ...2 6 CHAPTER 2 DIAGNOSIS...
Page 30: ...3 16 CHAPTER 3 SCALE TESTING AND CALIBRATION...
Page 52: ...A 4 APPENDIX A SERVICE MODES...
Page 55: ......
Page 56: ...PN 80010584 B SERVICE MANUAL EC SERIES SCALES 80010584...