1 3
Section 2 - Installation
2. Installation
In this section, you will learn how you unpack and install your new Moisture Analyzer and prepare it for opera-
tion. On completion of the steps described in this section, your Moisture Analyzer is ready for operation.
2.1 Unpacking and checking the standard equipment
Open the package and remove the instrument and the accessories. Check the completeness of the delivery.
The following accessories are part of the standard equipment of your new Moisture Analyzer.
1 Box, Aluminum sample pans
1 Pan support
1 Pan handler
1 Specimen sample (circular, absorbent cellulose disk)
1 Draft shield element
1 Heat shield
1 Power cable
1 Set of operating instructions
1 Warranty card
Remove packing material from the instrument.
Check the instrument for transport damage. Immediately inform your Ohaus dealer if you have complaints or
parts are missing.
Store all parts of the packaging. This packaging guarantees the best possible protection for the transport of your
instrument.
All manuals and user guides at all-guides.com