01/09/2006
Page - 36 -
9.
On site calibration procedure:
Warning
: On site calibration will have as consequence
the lost of "GEO code
", so in case
of main board replacement it is preferable to recover calibration parameters by license
updating (
see tutorial file HeliosEng.chm) .
- Set the scales level.
- Remove the fitted plate (7 see drawing 29270001)
- Remove the sealing label (7 in drawing 29270077)
- Insert a straightened paper clip (or a pointed object) into the hole provided for calibration.
- Press the Toggle Switch
once in order to get the top position.
- Install the fitted plate.
- Switch on the scales.
The scales self-test and after choosing menu "1 -> CALIBRATION" display:
RANGE CHOICE :
2 = 3 =
6 kg/2g 15kg/5
29200
STEADY
Press the 2 or 3 key to select the range you want:
Ex.: press the 3 key to select the 15kg/5g range.
The scales display:
ZERO CALIBRATION
29200
STEADY
The increment number of the zero zone for this range is between 8000 and 100000.
The scales display:
ADJUSTEMENT MODE
MANUAL CALIBRATION
Number of
increment at zero
ADJUSTEMENT MODE
MANUAL CALIBRATION
As soon as the
message "STEADY" is
displayed,press the V
key to validate.
Summary of Contents for RI Series
Page 1: ...RI Series Maintenance manual Range 15 kg d 5g Range 6 kg d 2g...
Page 21: ...01 09 2006 Page 21 5 Seal...
Page 40: ...01 09 2006 Page 40 On Off switch for internal and external batteries On Off switch for mains...
Page 44: ...01 09 2006 Page 44 10 3 2 Electrical diagram 29120154...
Page 50: ...01 09 2006 Page 50 10 4 7 Diagrams Main Board 71207283 1 6...
Page 51: ...01 09 2006 Page 51 Main Board 71207283 2 6...
Page 52: ...01 09 2006 Page 52 Main Board 71207283 3 6...
Page 53: ...01 09 2006 Page 53 Main Board 71207283 4 6...
Page 54: ...01 09 2006 Page 54 Main Board 71207283 5 6...
Page 55: ...01 09 2006 Page 55 Main Board 71207283 6 6...
Page 74: ...01 09 2006 Page 74...