CHAPTER 4 TESTING
4.1 TESTING
Before and after servicing the Indicator, operational and performance tests should be made to
determine if it meets specifications. Turn the Indicator ON and allow it to warm up for at least
20 minutes before performing these checks.
The masses used for calibration should be ASTM Class F or OIML Class M1 tolerance or better.
NOTE:
Make sure the test area is free from drafts and that the base rests on a level and
vibration-free surface.
4.2 Power
Test
The purpose of this test is to determine if the electronic circuitry of the Indicator is functioning
properly or not.
1. Connect a functioning AC Adapter to the Indicator power plug.
2.
Plug the AC Adapter into a suitable power source.
3. With the Indicator connected to an appropriate power supply, press the
ON/ZERO OFF
button. The Indicator performs a self-test, indicates the software revision and then goes
into weighing mode.
4.
If all of the displays appear normal in this test, continue with the next test. If the display
did not appear, check the AC adapter output and repeat the test with a good adapter.
If the display was erratic, the PC board is defective and requires replacement.
4.3 Performance Tests Using a Scale Base
These tests are performed on the Indicator using a known good scale base and test mass.
At this point, the Indicator has been checked for full display, menu setup and calibrated.
If a Load Cell Simulator is being used, proceed to paragraph 4.4.
SD Series Scales Service Manual
4-1
Ohaus Corporation www.ohaus.com
Summary of Contents for SD Series
Page 2: ......
Page 4: ......
Page 12: ...CHAPTER 1 GETTING STARTED Ohaus Corporation www ohaus com 1 6 SD Series Scales Service Manual ...
Page 20: ...CHAPTER 2 TROUBLESHOOTING Ohaus Corporation www ohaus com 2 8 SD Series Scales Service Manual ...
Page 36: ......
Page 37: ... 80120061 P N 80120061 SERVICE MANUAL SD SERIES BASE INDICATOR ...