5.
Operating Procedures and Operational Checks
5
-
1.
Loading the Screws
Open the screw bin lid. While the bin dipper plates are at the lowest position,
pour in the screws until they are piled up to about 3 mm below the rail upper
surface. Make sure that screws are equally distributed into the right-and left-
hand bins.
Do not load the screws to excess amount.
5
-
2.
Operating this machine
Connect the accessory AC adapter plug to the DC jack on the rear of this machine, and the other side to a power outlet.
Turn on the main power switch. The lamp incorporated in the power switch will illuminate.
Turning on the power switch causes the drive motor to rotate normally, the bin scooper plates to move up and down, and the rail to
vibrate. After a while, the loaded screws are sequentially transported along the rail and delivered to the stopper. If the screw is not
picked up for an extended period of time, the vibration will automatically come to a stop. At the moment the screw is picked up, this
machine resumes operation.
DC
jack
Timer setting control
Power switch
(
lamp-
incorporated
)
Screw bin
Rail
Approx. 3 mm
Employed
screws
Bin scooper plates
CAUTION
- 9 -
Summary of Contents for NJ-2320
Page 25: ...Notes...