Pre-purge position
phase 24–34
Ignition position
phase 36
Transition 1
phase 44
Transition 2
phase 52
Post-purge
phase 72–78
Active program stop in phase 24.
Params & Display
Ratio Control
Program Stop
deactivate
24 PrePurgP
32 PreP FGR
36 IgnitPos
44 Interv 1
52 Interv 2
72 PostPPos
76 PostPFGR
Manual start-up
Prerequisites:
● Frequency converter parameters are set and adjusted.
● Interlocking and failures are reset.
● Program phase is 12,
Stand by
.
● In heavy fuel oil use preheater temperature is sufficient.
Activate manual burner start-up from menu level
Autom/Manual/Off
by choosing
BurnerOn
:
ManualOperation
Autom/Manual/Off
Auto
BurnerOn
BurnerOff
Checking pre-purge position
Turn the burner control switch into position 2,
autom
. The burner starts if all
prerequisites for start-up are fulfilled. Program phase changes12…20…21, etc. and
stops at phase 24. A message
Special position reached
appears on the display.
The burner has reached the pre-purge position, and the servomotor positions can be
modified if necessary. The final pre-purge setting is done when burner ignition load and
curves are set.
M5178 1647EN
63 (129)
Summary of Contents for GKP-350 M
Page 2: ......
Page 5: ...6 15 Burner part list 129 M5178 1647EN 3 129...
Page 6: ...4 129 M5178 1647EN...
Page 18: ...Block diagram of contact links Block diagram ver 5 16 129 M5178 1647EN...
Page 100: ...5 5 Time sequence diagram gas use Time sequence diagram G ver 3 98 129 M5178 1647EN...
Page 101: ...Time sequence diagram Gp1 ver 5 M5178 1647EN 99 129...
Page 132: ...130 129 M5178 1647EN...
Page 133: ......