10
40180036GB
5. Burner
Automation
5.1. Time Sequence Diagram (High-Low)
Required input signals to control unit
Control signals
Permissible input signals to control unit
A
Control loop
Q
Servomotor
B
Fan motor
D
Differential air pressure switch
PL
Fan pressure 0,4 - 100 mbar
E
Thermostat/pressurestat, partial load PF
Combustion chamber pressure -2…+5 mbar
F
Thermostat/pressurestat, full load
PBr
Burner pressure, gas 0,5 - 100 mbar
G
Ignition transformer
V
Gas/air ratio control
H
Main gas valve, NC
(PBr:PL) 0,75:1…3:1
L
Gas/air ratio controller
N
Zero point corr/- 1 mbar
M
Gas valve, NC
P
Flame signal
W
Sequence switch stopped (LFL)
O
Air damper
Adjustable switching points on the cam switches of the servomotor
I
= switching point of full load
I
= switching point of ”closed” position
III
= switching point of ignition/partial load
Summary of Contents for GP-6.10 P
Page 2: ......