www.okinternational.com
- 13 -
P/N 7000-1370, Revision B
1. Set the APR-5000 Main power switch to the “on” position.
2. On the “desktop” Double click
the icon. Allow system to initialize.
Your startup screen will appear as follows:
From this startup screen you have 3 options:
1. Process Run – This selection allows you to open and run a previously created
and stored profile for either placement or removal.
2. Process Setup – This selection allows the modification of a previously stored
profile or the creation of either a placement or removal profile.
3. System Setup – This selection allows you to set the system parameters, security
levels and enter the calibration modes.
Process Run - Placement
1. Select Process Run from File Menu. Open the desired profile.
2. Attach vacuum cup.
3. Attach reflow nozzle. Click Next
4. Pull out camera to continue. Insert centering fixture. Click Next
5. Use action buttons to pick up the component. (Camera view pops up on the
screen) Press action buttons to move head into focus. Click Next
6. Manually fine adjust component to vacuum tube, this brings the component into
focus using the Up Down buttons on the screen. Align the component using the X
Y and Theta axes adjusters. Click Next and return camera home
7. Display will now change to the profile view. “Hit action buttons to move the reflow
head down into placement position.” Adjust component height using computer
screen buttons. Click Next
8. Select Next to release the component onto its target pads.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com